What makes up the three-year cost of ownership
The cost of owning a wearable device has four components: purchase, energy and charging or cells, handling work and replacement. The third is the easiest to overlook, because it does not appear on an invoice. With a hundred workers, each extra minute of daily handling is multiplied by the number of devices and working days.
The three-year horizon was chosen because it covers a typical depreciation period and shows when the cost of cells or charging will equal the difference in purchase price.
How the battery behaves and why there is no single figure
The battery life of a device is not guaranteed as a product constant and depends on the configuration and conditions. A worker's device periodically sends the list of heard transmitters, the signal strength, the battery state and its status (heartbeat), so the frequency of this transmission and the operating temperature affect energy consumption.
The calculation therefore assumes figures that you can change: charging every 3 days for the BLE variant with a rechargeable battery, every 2 days for the UWB variant with a rechargeable battery, and replacing the cell once a year for the BLE variant with a primary cell. These are scenarios, not manufacturer promises.
Handling cost of 100 devices over 3 years (example)
BLE with a rechargeable battery: the cost is mainly charging work
For a hundred devices charged every 3 days, this gives about 83 charges a year per unit with 250 working days. With the assumed handling of one charge taking half a minute, this is about 69 hours of work a year for a hundred devices, and about 208 hours over three years. At a rate of 60 PLN per hour, this comes to 12,500 PLN.
On top of that comes the infrastructure: charging stations or multi-chargers, which are bought and integrated, because InnerWeb supplies software, not chargers.
UWB: more frequent charging and more expensive handling
A UWB device, which measures the time of flight of the signal, consumes more energy than a transmitter in a low-rate transmission mode. Under the assumption of charging every 2 days, handling comes to about 104 hours a year for a hundred devices, and about 313 hours over three years, that is about 18,750 PLN. If the supplier guarantees a longer operating time, reverse the calculation: it is enough to change one assumption.
BLE with a primary cell: little work, but the cost of cells
The variant with a primary cell removes daily rotation, but requires replacement. Assuming one replacement a year, 3 minutes per unit and 8 PLN per cell, over three years this gives 15 hours of work (900 PLN) and 2,400 PLN for the cells, a total of 3,300 PLN. This variant is the cheapest to handle, but it depends on the assumption of annual replacement: if the cell runs out after a quarter, the result reverses.
How to use the result in the purchasing decision
Add the result of the calculation to the purchase price of each variant and compare the totals over the three-year horizon. Add the cost of replacing damaged units based on your own failure statistics, and a stock of devices for rotation. Ask suppliers for measured operating times under the conditions of your plant, including low temperatures, because this assumption shifts the result the most.
Replacing damaged devices and the rotation stock
Add a reserve to the handling cost. In deployment practice, a stock of devices is kept for rotation and replacement, because some units are always charging, in service or lost. Size the stock according to your own statistics: the longer the charging time relative to the shift, the larger the stock. If workers leave devices in the changing room, also account for the time of issuing and returning them at the start and end of the shift, which was not counted in the calculation.
It is worth keeping the cost record for each variant in one spreadsheet with columns: purchase, chargers, charging work, cells, stock, service. With this, after the first quarter of work with real data, you will replace the sample assumptions with measurements and see which variant actually wins in your plant.
Pitfalls of comparing offers
The most common mistake is comparing the price per unit without the battery operating time. The second is assuming that the value from the product datasheet applies in a hall with low temperatures or frequent transmission. The third is omitting the chargers because they are "included in the kit". Ask for a test on a dozen or so devices over at least two weeks of work in real conditions before you order the whole set.
Handling cost of 100 devices over 3 years
| Parameter | Value |
|---|---|
| Number of devices | 100 pcs |
| Working days per year (assumption) | 250 days |
| BLE with a rechargeable battery: charging every (assumption) | 3 days |
| UWB with a rechargeable battery: charging every (assumption) | 2 days |
| Handling of one charge (assumption) | 0.5 min |
| BLE with a primary cell: replacement once every (assumption) | 12 months |
| Cell replacement (assumption) | 3 min per unit |
| Cell (assumption) | 8 PLN |
| Cost of one hour of work (assumption) | 60 PLN |
Result: BLE with a rechargeable battery: approx. 208 h, 12,500 PLN. UWB with a rechargeable battery: approx. 313 h, 18,750 PLN. BLE with a primary cell: 15 h of work (900 PLN) and 2,400 PLN for cells, a total of 3,300 PLN.
Note: Sample calculation. Battery operating time is not guaranteed as a product constant and depends on the configuration and conditions; substitute your own assumptions. Device purchase prices are not included. Indicative ranges from 2025–2026 deployments; individual quote.
Video
Frequently asked questions
Does the calculation include the device price?
No. Insert the purchase price from the suppliers' offers; the calculation shows the handling cost, which is usually omitted in offers.
Where does the assumption of charging every 3 days come from?
It is a sample assumption, because operating time depends on the configuration and conditions. Replace it with the value measured in a test in your plant.
Is the device worn for the whole shift?
Yes, which is why the charging rotation is planned so that every worker receives a charged device at the start of the shift.
Who buys the chargers?
InnerWeb buys and integrates the multi-chargers and the wearable devices; the only item it manufactures is the industrial beacon.
Let's talk about location in your plant
We will show how a system based on many BLE transmitters behaves in a hall similar to yours. Book a conversation with the InnerWeb team.
Let's talk