The unit of comparison: an infrastructure point
Unit prices in offers differ by an order of magnitude, but only the number of points shows how much work awaits the hall. An infrastructure point is every device mounted in the plant: a BLE transmitter, a UWB anchor or a Wi-Fi access point. Each one raises three questions: does it need power, does it need a network cable and how long does mounting take at a given height.
For a 5,000 m² hall, the InnerWeb system assumes 1 transmitter per 100–200 m², that is 25 to 50 points. The transmitters are battery-powered, so they need neither power nor a cable.
The BLE variant: the least installation work
Bluetooth Low Energy operates in the 2.4 GHz band, and battery-powered transmitters can work for years with a low transmission rate. Mounting means hanging the transmitter and recording its position on the hall map. The position is recorded in centimetres (x, y, z coordinates), and the map displays it after conversion to metres.
The BLE cost also includes work on the map: the plant structure is drawn in an editor, and a map is built for each facility during the deployment work. The InnerWeb industrial beacon has an industrial design, a CE declaration and ATEX design for zones 2 and 22, which matters when part of the hall is in a hazardous zone.
Installation hours in a 5,000 m² hall (example)
The UWB variant: dense, powered anchors
UWB, as defined by IEEE 802.15.4z, measures the time of flight of the signal and, under favourable conditions, offers an accuracy of a few dozen centimetres, but requires a dense infrastructure of anchors that are powered or cabled. Each anchor is therefore a point with power, often with a network cable, mounted at a height and in sight of the wearable device.
In a hall with overhead cranes, racks and machines, this means cable routes, work at height and planning of downtime, whose cost often exceeds the price of the anchors themselves.
The Wi-Fi variant: power is available, but the accuracy is different
Location accuracy based on Wi-Fi signal strength is usually in the range of a few metres and depends on the density of access points and on calibration. If a Wi-Fi network already exists, some of its points may serve location without new cabling, but a network designed for data transmission is often too sparse. Densifying it means new points with cables and power, plus calibration.
Sample calculation: a 5,000 m² hall
The calculation below counts points and installation hours. The density figures for UWB and Wi-Fi and the installation times are sample assumptions to be verified with the supplier; for BLE, the density comes from InnerWeb practice (1 per 100–200 m²). We deliberately do not give device prices: insert your own from the offers and multiply by the number of points.
Result: BLE requires 34 points with no power and no cable, about 6 hours of installation. UWB under the assumption of 84 anchors with cable, about 126 hours. Wi-Fi under the assumption of 50 points with cable, 50 hours. The difference in installation work is an order of magnitude in favour of BLE.
What the comparison of points does not cover
The comparison does not cover the cost of wearable devices, software licences or maintenance; we describe these elements separately on the page about the cost of a worker's device. It also does not cover downtime: installation in a hall working in continuous mode is sometimes allowed only during service windows, which extends the deployment calendar but does not change the number of points. For each variant, also add the as-built documentation and an accuracy control test on a dozen or so points in the hall.
Scaling: from one hall to a whole plant
The calculation for a 5,000 m² hall is easy to scale. For a plant made up of several buildings, you add up the number of points per building and add transmitters every 100 m along the plant road. Remember that the cost of work on the map grows more slowly than the number of points: the plant structure is drawn once in the map editor, and further halls are added to the same structure. For a group of plants, the data model and software are shared, so the marginal cost of each additional facility falls.
A good practice is to record the calculation assumptions in the offer and return to them after the acceptance test: if the number of points or installation hours deviates from the assumed values, you correct the plan rather than the settlement afterwards.
Points and installation hours in a 5,000 m² hall
| Parameter | Value |
|---|---|
| Hall area | 5000 m² |
| BLE: density (InnerWeb practice 100–200 m², 150 assumed) | 150 m² per transmitter |
| UWB: density (sample assumption) | 60 m² per anchor |
| Wi-Fi: density for location (sample assumption) | 100 m² per point |
| BLE transmitter installation (assumption) | 10 min per point |
| UWB anchor installation with cable (assumption) | 90 min per point |
| Wi-Fi point installation with cable (assumption) | 60 min per point |
Result: BLE: 34 points, 0 with cable, approx. 5.7 h. UWB: 84 points with cable, 126 h. Wi-Fi: 50 points with cable, 50 h.
Note: Sample calculation. The UWB and Wi-Fi density and the installation times are assumptions to be verified with suppliers; device prices are not included. Indicative ranges from 2025–2026 deployments; individual quote.
Video
Frequently asked questions
Do I have to bring power to BLE transmitters?
No, the transmitters are battery-powered. Power and cabling concern UWB anchors and Wi-Fi access points.
Where do the assumptions for UWB and Wi-Fi come from?
They are sample assumptions to be verified. The UWB supplier and the IT department will give the density for your hall; put it into the calculation.
Does the density of 1 per 100–200 m² apply to every building?
It is a starting point for a building. Critical zones and halls with a lot of metal are planned more densely after measurements on site.
Does InnerWeb supply Wi-Fi or UWB equipment?
InnerWeb is the manufacturer of the software and the industrial beacon; the remaining equipment is bought and integrated by the client.