Starting point: a plant at the offer and demo stage
In this scenario the agricultural machinery plant belonging to a global group is at the demo stage. The system has been presented, and the director expects an answer to a specific question: what their hall will look like on the online map, who will be visible on it, and where work is in progress. This is a deployment scenario and a concept, not a description of a completed project. All figures below are planning rules, not measurements from a specific facility.
A hall for agricultural machinery has typical features that shape the map setup: large cubic volume, assembly lines running in parallel, separate welding and painting stations, a parts warehouse, and forklift and pedestrian traffic on shared routes. The map should therefore show not only the outline of the building but also what happens inside it: where a person is, where a hot work permit has been issued, and what risk is assigned to that spot.
The system works as an independent layer that complements existing plant solutions such as access control, time and attendance, HR or ERP. It does not replace them and does not require replacing readers. For the director, this means the demo concerns a new layer of visibility, not a rebuild of the plant's infrastructure.
What the director will see: a 2.5D isometric map with live objects
The online map shows the plant plan in a 2.5D isometric view, with live objects, and it is built in the browser. The director does not install an application: they open the map on an ordinary computer or tablet in the conference room. The map is prepared separately for each facility, so the agricultural machinery hall gets its own configuration rather than a template shared by all plants.
The most convincing moment of the demo is entering a building. A double-click on the building solid on the online map takes the viewer inside, and the walls in front of the camera are lowered to 1 m so they do not block the interior. A double-click outside the solid zooms the map in. The director therefore sees the hall from the outside and, with one click, from the inside, without switching programs.
A person on the map and their floor
A double-click on a person opens the building on the floor where that person is. The floor follows from the person's location, line or area. For a director of a multi-storey plant this has a practical meaning: a person reporting an event on a mezzanine is not shown in the same way as a person on the ground floor.
The position of a person on the map comes from periodic signals from their BLE device. Location works without GPS, and the position is averaged across signals from several transmitters. As a result, inside the hall, where satellites do not reach, the map still shows which part of the building someone is in.
One hall at a time and layers
The online map shows one hall at a time, and the layers for people, deliveries and permits filter the data along the chain: location, line, area, hall. During the demo the director can therefore switch off deliveries and keep only permits, or the other way round, to see how traffic at the gate compares with work on the line.
Approximate number of transmitters for a 5,000 m2 hall
Placing transmitters: a rule, not guesswork
The planning guideline for the demo is simple: plant roads are covered with transmitters about every 100 m, and inside buildings the planning assumption is one transmitter per 100 to 200 m2. For a hall of 5,000 m2 this gives an approximate range of 25 to 50 transmitters. This is an example calculation and does not replace a placement design prepared on the plan of the specific hall.
A denser layout, closer to 100 m2 per transmitter, makes sense where more precise positioning matters: at welding stations, in the paint shop and at gates. A sparser layout, closer to 200 m2, is enough in warehouses and in areas where it is enough to know which zone someone is in. The director therefore gets not a single number but a range that depends on what they want to see.
- plant roads: one transmitter about every 100 m
- inside buildings: one transmitter per 100 to 200 m2
- a 5,000 m2 hall is planned at roughly 25 to 50 transmitters
- denser placement at high-risk stations and at gates
Permits and risks assigned to a place
The map is the basis on which permits for hazardous work issued from templates are displayed. A permit covering several locations is drawn as a single outline, an ellipse with a 5 m margin around the points, rather than as a single point. For the director this is a clear way to see that the repair of a canopy and the work at a neighbouring station are one job. The outline is a visualisation of where the permit applies, not a hazard zone in the legal sense.
Risks are assigned to locations, so a person entering a place with a specific risk is visible against the background of that risk. In the demo scenario the dispatcher also sees SOS and no-movement signals on the map, which shows that the same map serves both production and safety. Plant visitors can be registered at a kiosk using a QR code from the invitation, and their route through the hall is visible on the same map.
How the demo is assessed and what comes next
The demo ends with a decision that the director can make on their own criteria. It is worth writing the criteria down before the meeting: whether the hall plan is readable, whether entering a building works smoothly, whether filtering layers answers the questions of production and occupational safety, and whether the transmitter scope fits the budget. The answers to these questions are measurable and do not require trusting the vendor's declarations.
The next step is preparing the map for a specific facility: the building plan, the anchor and rotation of the hall, and the plant's 3D assets. The full map works once the hall's anchor and rotation and the 3D assets are set. Only then does the deployment team move on to transmitter placement and a pilot on the chosen hall, not on the whole plant.
- prepare the building plan and the list of floors
- set the anchor, rotation and scale of the hall
- plan transmitters by the rule of 100 m on roads and 100 to 200 m2 inside buildings
- choose one hall to start with
Video
Frequently asked questions
Does the scenario describe a plant that has already been deployed?
No. It is a deployment concept for an agricultural machinery plant that knows the system from a demo. The figures are planning rules, which the deployment team replaces with measurements of the specific hall.
Does the map require installing a program?
No. The online map is built in the browser, so the director and the dispatcher open it on an ordinary computer or tablet.
Does location inside the hall require GPS?
No. The position comes from periodic signals from BLE devices and is averaged across signals from several transmitters, so it works without GPS.
How many halls does the map show at once?
One hall at a time. The layers for people, deliveries and permits filter the data along the chain: location, line, area, hall.
See your own hall on the map
Book a demo of the isometric map on the plan of your plant. We will go through transmitter placement and the choice of the hall to start with.
Let's talk