How many transmitters for a 5000 m2 hall: guide

For a hall of 5000 m2 the starting point is 25-50 transmitters, because inside a building one transmitter is planned per 100-200 m2. Below we show how to choose the number to buy from this range and how to place the transmitters on the map before ordering anything.

25-50
transmitters per 5000 m2 hall
Source: sample calculation

The formula and the result for a 5000 m2 hall

The number of transmitters is estimated as the area divided by 100-200 m2 per transmitter. For 5000 m2 this gives 50 units in the dense variant and 25 in the sparse one.

The dense variant is chosen where a better location matters, for example in halls with dense machinery and racking. The sparse variant is enough in open halls with a simple layout. The result is a range, which only the project can narrow down.

How the position is calculated and why it matters

The employee position results from periodic signals from their BLE device and is averaged across the signals of several transmitters. Location works without GPS. This means transmitters must be placed so that every point of the hall receives signals from several of them, not from just one.

That is why the number of units alone is not enough. Twenty-five transmitters clustered along the walls will give a worse result than the same number spread evenly.

Transmitters for a 5000 m2 hall

Transmitters for a 5000 m2 hallNumber of transmitters: 25 in the sparse variant and 50 in the dense one for a 5000 m2 hall01020304050unitsSparse variant (200 m2): 25 units25 unitsSparse variant (200 m2)Dense variant (100 m2): 50 units50 unitsDense variant (100 m2)
Source: Sample calculation: 5000 m2 / 100-200 m2 per transmitter

Placement on the map before purchase

Planning is done on the hall map, before the equipment is ordered. Draw the outline of the hall, mark the columns, racking and machines, and then spread the points on a grid with a mesh of about 10-14 m for the dense variant and 14-20 m for the sparse one. The grid follows from the square root of the area per transmitter: for 100 m2 it is 10 m, for 200 m2 about 14 m.

Then move the points so that they sit on fixed elements, for example columns, and avoid places above large metal sheets. Finally, count the points and compare them with the range 25-50.

Access roads and yards

Outside the hall the count works differently: plant roads are covered with transmitters about every 100 m. If 400 m of access road lead to the hall, add 4 units.

For the full calculation, add the building and the roads together and pass the resulting range on for quotation. The calculation of costs is described on a separate page about the cost of preparing the map.

Mistakes to avoid

The most common mistake is choosing the number from the lowest value of the range without checking the layout of the hall. The second is placing transmitters only at the entrances, because that is where mounting is convenient. The third is leaving no reserve for extending production lines.

We recommend leaving 10-15 percent of free points in the grid in the design and verifying the placement during a short walk-through of the hall with the device.

Example: a 5000 m2 hall with an access road

Assume a 5000 m2 hall with 400 m of access road. In the dense variant the building needs 50 transmitters and the road 4, in total 54. In the sparse variant: 25 plus 4, in total 29. You pass the range 29-54 for quotation, and only the design on the map narrows it down to the number to order.

The range is not a planning flaw but an honest picture of uncertainty before the design. A narrow result without placement on the map would be guesswork.

Walk-through test after installation

After installation walk through the hall with the device and watch on the map whether the position changes smoothly and not in jumps. Places where the marker jumps or disappears indicate gaps in the grid and are the first candidates for an additional transmitter.

Record the results of the walk on the hall plan and attach them to the project documentation. During a later reconstruction of the hall, this record will show which points have to be verified again.

Video

Frequently asked questions

Are 25 transmitters enough for 5000 m2?

It is the lower limit of the range for an open hall; with dense layouts choose a variant closer to 50.

Does location work without GPS?

Yes, the position results from BLE signals averaged across several transmitters.

How do I count the transmitters on roads?

Divide the length of the plant roads by about 100 m.

When is the dense variant appropriate?

When the hall has a lot of machinery and racking, or when a better location matters.

Let us talk about the map of your plant

We will arrange a short presentation of the isometric map on a sample plant and go through the data that has to be collected in your case.

Let's talk