How do you enter a building interior?
A double-click on a building volume on the online map enters the building, while a double-click outside the volume zooms the map in. These are two different gestures and it is worth demonstrating both in training, because beginners double-click empty space and are surprised that the view only zooms in.
Once inside, the walls in front of the camera are lowered to 1 m so that they do not block the interior. This way workstations and people are visible, and the building outline remains readable.
When does the floor selector appear?
The floor selector appears only when the selected building has at least two floors. In a single-storey building there is nothing to switch, so no buttons are shown and there is nothing to look for.
The buttons are labelled G, 1, 2 in the Polish version and 1, 2, 3 in the English version. The difference comes from the floor numbering convention in the two languages, so in a training session for an international team it has to be explained, so that floor 1 in the Polish version is not mistaken for the ground floor in the English one.
Floor selector window
What about a building with many floors?
Above 12 floors the selector shows a window of 12 buttons with up and down arrows. You can also scroll with the mouse wheel or the trackpad, which is convenient for people who work on the map for long periods.
In a high-rise the dispatcher does not have to click through the whole list: they move the window to the right range of floors.
How do you find a person who is on another floor?
A double-click on an employee on the map opens their building at the floor where they are. The floor follows from the employee's location, line or area, so the dispatcher does not guess the floor but gets it from the data.
This is the most important feature during an incident: one gesture replaces a radio question about which floor someone is on.
Why do some buildings have no name on the map?
Building names appear from zoom level 16, and at a lower zoom only the names of views, that is departments, are visible. Inside a building the names are always visible.
Only an area that has an outline and a height, that is an object with a volume that can be entered by a double-click, receives a name. An area without a volume stays unlabelled, and this is not a fault.
Can one volume show two areas?
The consistency rule applies: one area is exactly one volume on the online map. When several candidates match a volume, the system does not guess and does not assign a name. In that case the editor has to decide which area belongs to it.
For the end user what matters is that the name on the map is always confirmed, not assumed.
How to practise these gestures in training
In a dispatcher training session a three-step exercise is enough: enter a building with a double-click, switch between two floors and find the indicated person by double-clicking their marker. The exercise takes a dozen minutes and builds a habit that saves radio questions during an incident.
It is good to include a building whose names are not visible from a distance, so that participants understand the difference between the view of departments and the view of a building. A short card with the gestures at the dispatcher's workstation also helps.
Video
Frequently asked questions
Will I see a floor selector in a single-storey building?
No, the selector appears only when there are at least two floors.
How quickly can you find a person's floor during an incident?
Double-click the employee on the map, because it opens their building at the right floor.
Do the walls block the view of the interior?
No, the walls in front of the camera are lowered to 1 m so that the interior is visible.
Why do I only see departments from a distance?
Building names are shown from zoom level 16; before that, the names of views are visible.
Let us talk about the map of your plant
We will arrange a short presentation of the isometric map on a sample plant and go through the data that has to be collected in your case.
Let's talk