InnerWeb
Skip to main content

Hall georeferencing: anchor, rotation and scale

Georeferencing links the hall's local metre grid to a point on the ground, and without it the 3D map will not show the hall in the right place. It rests on three parameters: the anchor point, the rotation and the scale. Below is the order of work and the pitfalls that the deployment team should go through before the pilot.

3
georeferencing parameters: anchor, rotation, scale
Source: card
100 m
spacing of transmitters on plant roads
Source: card

The three parameters and what each one does

Hall georeferencing rests on an anchor point (latitude and longitude), a rotation and a scale. Together they link the hall's local metre grid to a point on the ground. The anchor says where on the ground the reference point of the hall lies, the rotation sets how the hall is oriented relative to the compass, and the scale ties metres on the plan to metres in reality.

The full map works once the hall's anchor and rotation and the plant's 3D assets are set. If any element is missing, the effects are easy to confuse with other faults: the hall stands next to its own place on the orthophoto, or it is turned relative to the roads. The team should therefore treat these three parameters as one task, not as three independent ones.

Order of work

The proposed order follows the dependencies: first what the other parameters depend on, then the fitting.

1. Collect the plan and the 3D assets

Before setting the parameters, have the building plan and the plant's 3D assets. Without them there is nothing to fit, and the full map will not work.

2. Set the anchor

Choose a reference point that can be unambiguously identified on the orthophoto, for example a corner of the hall. Record its latitude and longitude. The clearer the point, the easier it is to verify later.

3. Set the rotation

Rotate the hall so that its edges line up with the roof on the orthophoto. Check the rotation on two opposite corners, not on one, because a small angular error grows with distance.

4. Check the scale

Measure on the plan the distance between two known points and compare it with the distance on the map. The worker preview gives the distance in metres calculated in the hall's local grid, so any scale error will be visible in those distances.

5. Verify the solid and the entrance

After setting the parameters, enter the hall with a double-click on the online map. If the solid matches the roof and the base, you can move on to the transmitters.

Example: point displacement at a constant rotation error of 1 degree

Example: point displacement at a constant rotation error of 1 degreeLine chart: the position error grows with distance from the anchor, from 0.9 m at 50 m to 7 m at 400 m.02468m50 m from the anchor100 m200 m400 m50 m from the anchor: 0.9 m0.9100 m: 1.7 m1.7200 m: 3.5 m3.5400 m: 7 m7
Source: Example calculation: error equals distance times the sine of 1 degree (about 0.0175), rounded

Pitfalls that come up most often

The first pitfall is an anchor set in the middle of the hall instead of at a corner that is easy to verify. The centre is hard to locate on the orthophoto, so the error goes unnoticed. The second is checking the rotation on a single corner. The third is assuming that the scale follows from the plan without verification, when a paper plan may have a different scale from the digital data.

The fourth pitfall concerns swapping latitude and longitude when entering the anchor. The result is a shift of the hall by hundreds of kilometres, which is obvious at once, but only if someone zooms out the map. That is why, after entering the coordinates, zoom the map out and make sure the hall stands within the plant.

  • the anchor on a corner that is visible on the orthophoto
  • the rotation checked on two opposite corners
  • the scale verified on a section of known length
  • latitude and longitude entered in the correct order

Before the pilot starts

A pilot on one hall begins once three gates are passed: the georeferencing matches reality, the building solids are linked with the structure data, and the transmitters are placed by the rule of 100 m on roads and 100 to 200 m2 inside buildings. Location works without GPS, and the position is averaged across signals from several transmitters, so a georeferencing error carries over to every location on the map.

The team should document the parameter values: the anchor coordinates, the rotation angle and the adopted scale, together with the date and the person. After a rebuild of the hall, such documentation makes it possible to establish whether the change requires resetting the georeferencing or only correcting the building outline.

Video

Frequently asked questions

What is the anchor of a hall?

It is a point on the ground, described by latitude and longitude, to which the hall's local metre grid is linked.

When does the full map work?

When the hall's anchor and rotation and the plant's 3D assets are set.

Why check the rotation on two corners?

Because a small angular error grows with distance. With a 1 degree error, the displacement at 400 m is about 7 m.

Does location require GPS?

No. The position is averaged across signals from several transmitters, and georeferencing only sets its place on the map.

Let us set the georeferencing of your hall

The deployment team will set the anchor, rotation and scale on your plan before the pilot. Book a conversation.

Let's talk