FAQ: isometric 2.5D map of your plant

Plant directors and health and safety managers ask the same questions before ordering a map: what they will see, how much work falls on their side and what the map guarantees. We have collected the answers within what the system actually does, without promises beyond its function.

1 hall
view at a time, with filters along the location chain
Source: card
100-200 m2
per transmitter inside a building
Source: InnerWeb planning guidelines

What does the isometric 2.5D map show and how does it differ from a PDF plan?

The online map shows the plant layout in an isometric 2.5D view, with live objects: employees, deliveries and permits. A PDF plan is a static image, while the map is a set of data layers that can be filtered and refreshed, so the dispatcher sees the current state and not a drawing from a year ago.

The map is built in the browser, so no separate program has to be installed at the workstation. Each object is prepared separately, which means a hall, a building or a yard has its own settings, and a change to one does not affect the others.

What must the director provide for the map to start?

The basis is a plant plan divided into buildings, their outlines and information on how many floors each building has. In addition, a reference point on the ground is needed, namely an anchor with latitude and longitude, and a rotation that aligns the hall grid with the real world.

The full map works once the hall anchor and rotation are set and the plant's 3D resources are available. Without them the plan can be shown, but not the full view with building volumes and live objects. The project manager should collect this data before the first editing day; we describe the checklist separately.

Indicative transmitter density recommended in the brief

Indicative transmitter density recommended in the briefHorizontal bar chart: 100 m2 per transmitter in the dense variant, 200 m2 in the sparse variant050100150200m2 per transmitterBuilding, dense variantBuilding, dense variant: 100 m2 per transmitter100Building, sparse variantBuilding, sparse variant: 200 m2 per transmitter200
Source: InnerWeb planning guidelines: 1 transmitter per 100-200 m2 inside a building

What base layer is the map drawn on?

The base layer is an orthophoto, that is an aerial photograph at a uniform scale. Optionally, a custom OSM vector base can be added and blended with the orthophoto using a transparency slider, which is useful when the photograph is older than the last reconstruction and the map should show the current road layout.

Choosing the base layer is a decision for the project team: a photograph shows the real terrain better, while vector data marks roads more clearly. We describe a wider comparison in a separate recommendation on the map base.

Does the map show the whole company at once?

The online map shows one hall at a time. The employee, delivery and permit layers filter data along the chain: location, line, area, hall. For a plant with several buildings this means the user selects a view and only then looks at the details in it, instead of seeing everything in one tangle.

For the director this has a practical consequence: questions about the plant as a whole go to the layers and filters, while questions about a place of work go to a specific hall.

Is the employee position accurate and does it work without GPS?

The change of an employee's position results from periodic signals from their BLE device. Location works without GPS, and the position is averaged from the signals of several transmitters, which limits jumps caused by reflections and obstructions. Transmitter density is a parameter here: plant roads are covered about every 100 m, and inside a building one transmitter is planned per 100 to 200 m2.

We do not promise a single accuracy figure for every plant. For a large municipal project an accuracy below 1.5 m was achieved, but that is the result of one specific installation, and inside a hall it depends on the layout and the structure of the building.

What must not be promised to management?

Do not promise that the map replaces applicable regulations or that the outline of a permit is a hazardous zone in the meaning of the law. The outline is a visualisation of the permit location, not a decision on a zone. The map supports meeting the requirements and provides evidence for an audit, but it does not relieve anyone of the risk assessment.

Do not promise a deadline without input data either: preparation time depends on the quality of the plan and the number of buildings. An honest promise is: once the complete set of data has been collected, the map is prepared in the editor, and after approval it becomes the common basis for permits, protection and location.

How does the map connect with the plant's existing systems?

InnerWeb is an independent system complementing the client's existing systems, such as access control, time and attendance, HR or ERP, and it consists of 18 modules. The plant map is the common basis for the permit, protection and location modules, so a building drawn once works in several processes.

We do not manufacture or replace access control readers; we integrate with the system the client already has.

Video

Frequently asked questions

Is the map prepared once for the whole plant?

No, the map is prepared separately for each object. This allows the work to be split into stages: first the hall with the highest risk, then the remaining buildings.

Does the map work on a tablet in the field?

The map is built in the browser, so it works on devices with a modern browser. The exact set of workstations is defined in the project.

What if the plant plan is out of date?

The outline of a saved building can be moved or corrected without losing zones, lines and risks, so correcting the plan does not require building the map from scratch.

Does the map need GPS inside the halls?

No. The position comes from BLE transmitter signals and is averaged across several of them, so it also works where GPS does not reach.