Who these recommendations are for
The recommendations are addressed to the shift supervisor in a single-hall or multi-hall warehouse, and to the map administrator who prepares the site structure in the editor. The InnerWeb map editor has two structure modes: a large-object mode, in which the hall is a view, the area is a building and the line is a floor, and a single-hall mode, in which we have a hall, a zone inside it and a production line.
For most warehouses, including high-bay storage, the single-hall mode is closer to daily work: the hall is the place, the zone is a fragment of the walk, and the line is a sequence of workstations or racks that people remember as one whole. Choosing the mode is a design decision and it is worth making before data entry, because it determines how objects are named.
Seven recommendations for dividing the warehouse
Each recommendation comes with a short justification based on how the system locates objects and displays them on the map.
1. Start from the walk, not from the floor plan
Draw the zones the way the shift supervisor moves from place to place: receiving, buffer, picking, dispatch. An architectural floor plan is often out of date after several refurbishments, while the walk is the ground truth.
2. A zone is a place with one responsibility
If one person or one team is responsible for a fragment of the hall, make it one zone. In this way risks, permits and events are assigned to someone you can ask.
3. Name lines the way people speak
A production line in single-hall mode should serve recognition, not tidy up for the sake of it. If the warehouse talks about picking line A and B, enter those names, not the numbers from the warehouse management system.
4. Do not divide too finely
A position is determined from the signals of many beacons and averaged on the map. In a building one beacon covers 100 to 200 m2, so zones smaller than a single coverage area give an impression of accuracy that the signal does not provide.
5. Separate loading docks from aisles
Loading docks and access roads have a different beacon density than the inside of the hall. A separate zone for a dock lets you assign its own risks, for example vehicle traffic, and not mix them with the racks.
6. Assign risks to the place where they occur
The editor lets you assign risks to a building level, and the permit control and the dispatch centre later use the structure from the map. The more precisely a risk is assigned, the more accurately the dispatcher sees what an event concerns.
7. Agree the map with the team before going live
A short 20 to 30 minute walk-through with a phone and the map in hand reveals differences between what is on screen and how people name places. Correcting a name at this point costs a minute; after go-live it costs habit.
Number of beacons for a 3,000 m2 hall (example)
Why the map works without GPS
The InnerWeb location system works without GPS and is an independent system complementing the client's existing systems. In a warehouse with a metal roof and racks the satellite signal is unreliable, so zones must follow from beacons, not from coordinates from a receiver.
For this reason, it is worth linking zones on the map to the actual placement of beacons. A beacon near the border of two zones is not an error: the signal is averaged from several devices, and the border on the map is always an approximation.
Common pitfalls
The most frequent pitfall is transferring a structure from another system without thinking it through. The warehouse breakdown into WMS locations has thousands of positions, while the shift supervisor thinks in a dozen or so zones.
The second pitfall is renaming during operation. If a zone changes its name, the event history stays with the old one, which makes reporting harder. The third is entering risks without assigning them to a zone, so the dispatch centre does not know where to look.
Video
Frequently asked questions
How does single-hall mode differ from large-object mode?
In single-hall mode you have a hall, a zone inside it and a production line. In large-object mode the hall is a view, the area is a building and the line is a floor.
How many zones should a warehouse have?
As many as there are real responsibilities and places on the shift supervisor's walk, usually a few to a dozen. Zones smaller than the beacon coverage area do not increase accuracy.
Does the map require GPS?
No. The position comes from the signals of many beacons averaged on the map, so the system also works in a hall without access to satellites.
Let's set up the zones together with your team
Join a short session with the shift supervisor: we will agree the zones and lines together before you start entering data.
Let's talk