InnerWeb
Skip to main content

Warehouse reorganization: checklist for the map and beacons

Changing the layout of racks and aisles is an event for the location system just as much as installing new beacons: the map must match the hall. The list below organises what to check before the move, during it and after it, so that no route leads along old aisles.

100
divisor: the position in the database is in centimetres, the map shows metres
Source: function card

Before the reorganization: what to record

Before the first rack is moved, record the starting state: the positions of beacons in the aisles, the names of levels and zones, and the assigned risks. The position of a beacon is stored in the database in centimetres, and the map displays it divided by 100, so the record from the map and the record from the database must be compared in the same units.

Also establish which beacons stay in place, which are moved and which are excluded. A beacon in a new place without changing its entry in the database is the most frequent reason for route jumps after a move.

During: the order of work on the map

A saved building can be moved or its outline corrected without deleting it, so it keeps its zones, lines and risks. Do not delete the building or draw it again, because you would lose everything assigned to it.

Change the outline and zones first, then the beacon positions, and finally the risks assigned to levels and zones. This order limits the moments when the map is inconsistent.

After the reorganization: test after the change

After the change, check the number of route points recorded over the following minutes: an excluded beacon must not add points, while the others do. The test is carried out by the administrator from the system, without going into the hall.

If after the move no points appear for a beacon at its new place, the entry in the database points to the old position or the device is not broadcasting. If points keep appearing for the old entry, the device is still standing where it stood.

Old routes: what happens to the history

Route points are unchanging records of the moment of the signal, so correcting a beacon position applies only to future deliveries, and old routes keep the former layout. This is not an error, but a record of how the hall looked on that day.

For comparative reports, separate the periods before and after the reorganization. A single timeline with two layouts of the hall misleads, because the same aisles have different positions.

Labels and names on the map

After changing the layout, make sure the names of zones and levels match the new designation in the hall. The floor selector shows buttons only for a building with at least two floors, and the labels are P, 1, 2.

A name on the map belongs only to an area with an outline and a height. If you change the shape, make sure the outline kept its height.

Checklist

Video

Frequently asked questions

Does the map have to be drawn again after the reorganization?

No. A saved building can be moved or its outline corrected without deleting it, so it keeps its zones, lines and risks.

Why do routes still jump after the move?

Most often the beacon was moved but its entry in the database points to the old position. Check the route points over the following minutes.

Will the route history be updated?

No. Route points are unchanging records, so old routes keep the former layout.

Plan the reorganization together with the map

We will go through the order of work and the test after the change with you. Book a talk or a demo.

Let's talk