Step 1: choose the site structure mode
The map editor has two structure modes. In the large-object mode the hall is a view, the area is a building and the line is a floor. In the single-hall mode the structure is the hall, a zone inside it and a production line. A multi-level warehouse is described in the large-object mode, because only there is a floor a separate element.
Make the choice before drawing. Changing the mode after the zones have been drawn means rebuilding the structure, not changing a setting.
Step 2: draw the building outline with its height
Only an area with an outline and a height receives a name on the map, which means an object with a volume that can be entered with a double click. So draw the outline of the warehouse and enter its height. Without this the building does not receive a name and its interior cannot be entered.
Building names appear on the map from zoom level 16. Below this level only the view name is visible. Inside a building the names are always visible, so working on the levels does not require any extra setting.
Map editor thresholds for a multi-level building
Step 3: add floors and check the selector
The floor selector shows buttons only for a building with at least two floors. If you do not see the buttons after adding a level, check whether the building already has two. The labels in the Polish version are P, 1, 2 and so on.
Above 12 floors the selector shows a window of 12 buttons with up and down arrows and scrolling with the mouse wheel. For a typical warehouse this is more than needed, but the same mechanism serves tall facilities.
Step 4: assign risks to levels
The editor lets you assign risks to a building level. The structure map is then used by permit control and the control room, so a risk recorded on level 2 does not burden level P. This avoids false warnings on the ground floor when the hazard concerns only the mezzanine.
Examples of division in a warehouse: work at height on the upper storage level, forklift traffic on the ground floor, storage of flammable materials in one zone of one level. Every risk has an assigned level and zone.
Step 5: correct the outline without deleting the building
A saved building can be moved or its outline corrected without deleting it. This way it keeps its zones, lines and risks. Deleting it and drawing it again removes everything that was assigned to it.
After correcting the outline, check the floor selector again and the visibility of the building name from zoom level 16. These are the two fastest tests of correctness after a change.
Checklist
Video
Frequently asked questions
Why don't I see the floor buttons?
The selector appears only for a building with at least two floors. Add a second level and refresh the view.
Why does the building have no name on the map?
Only an area with an outline and a height receives a name. Names are visible from zoom level 16.
What if the outline has moved?
Correct the outline of the saved building instead of deleting it. Zones, lines and risks will be kept.
Who uses the assigned risks?
The structure map is used by permit control and the control room, so assigning a risk to a floor affects these modules.