The principle we start from
The InnerWeb position is determined from the signals of many beacons and averaged on the map. The basic consequence: what matters is not how many beacons there are in the whole warehouse, but how many of them can be heard in a given place. That is why density is defined for a type of space.
On-site roads are served by beacons about every 100 m. Inside a building one beacon per 100 to 200 m2 is assumed. These two numbers are enough for a preliminary price, which the site visit later corrects.
Recommendations for three types of places
A warehouse consists of places of different character, so a single density for the whole facility gives too many devices in one place and too few in another.
Access road and manoeuvring area
Here the spacing of about 100 m applies. A 600 m road therefore needs about six beacons, and at a bend or a junction it is worth adding one more, because that is where the decision about direction is made.
Loading docks and gates
A dock is a place where a vehicle stops, so it needs clear identification of the bay. With several gates side by side, a beacon assigned to each gate helps tell them apart, but it requires attention to duplicated identifiers, which are discussed below.
Aisles and racks
Inside the hall we count the area: one beacon per 100 to 200 m2. With tall racks the signal is blocked, so the lower limit of 100 m2 is safer in narrow and densely built aisles.
Breakdown of the 5,000 m2 hall calculation (dense and sparse variant)
- Variant 1 per 100 m2
- Variant 1 per 200 m2
Example calculation before the site visit
For a hall measuring 100 by 50 m, that is 5,000 m2, we assume two variants: one beacon per 100 m2 gives 50 devices, one per 200 m2 gives 25. An access road 400 m long adds about 4 beacons. Docks with 6 gates, assuming one beacon per gate, add 6.
Altogether the range comes to 35 to 60 beacons for such a facility. This is an example calculation based on the assumptions above, not an offer. The actual number depends on the structure of the hall, the height of the racks and the wall material, which are assessed on site.
A note on duplicated identifiers
With more beacons, the risk grows that two physical devices several hundred metres apart get the same major:minor identifier. The system recognises them as one entry, and a vehicle near either of them is placed at one stored location. A beacon mounted by the road that has a stored position inside the warehouse causes a route jump to that place and back.
For this reason the installation plan should include a table of identifiers with the mounting place, and after installation a control walk with a phone. The beacon position is stored in the database in centimetres, while the map displays it divided by 100, which is worth knowing when entering coordinates by hand.
What to confirm during the site visit
The site visit should settle three matters: whether the rack layout requires denser beacons, whether the mounting places have power or service access, and whether any part of the warehouse is a potentially explosive zone. The InnerWeb industrial beacon has an ATEX design for zones 2/22, so the presence of such a zone changes the choice of devices, but not the density rule.
Video
Frequently asked questions
Does density need to change with tall racks?
Yes. In narrow and densely built aisles it is safer to assume the lower limit of 100 m2 per beacon, because racks weaken the signal.
How many beacons for a 600 m road?
About six at 100 m spacing, plus one at a bend or junction where the decision about direction is made.
Is the price before the site visit binding?
No. It is a calculation based on assumptions. The site visit verifies the structure, power supply and any potentially explosive zones.