InnerWeb
Skip to main content

Location in a warehouse without GPS: questions from the logistics director

Location in a warehouse without GPS relies on signals from many beacons placed along aisles, at docks and on access roads. Logistics directors usually ask three things: how the system knows where a person or a forklift is, how densely beacons must be installed, and whether this works with the systems already in use. The answers below follow the order in which these questions usually come up in meetings.

100 m
spacing of beacons on access roads
Source: company data
100 to 200 m2
floor area per beacon inside a building
Source: company data
< 1.5 m
accuracy in the city project with 11,000 beacons
Source: company data

Does warehouse location really need GPS?

No. The InnerWeb location system works without GPS. A phone, a locator or an active card hears BLE beacons installed at known points, and the system records which beacons were detected and when. The position of every beacon is stored in the database, so detecting a beacon is information about a place.

In a high-bay warehouse this matters in practice: racking, sheet metal and the roof block the satellite signal, and the question "is someone in aisle 14" needs an answer that GPS cannot reliably give in the middle of a hall. A delivery route shown on the online map is therefore a path between beacon positions detected by the phone, not a GPS trace.

How is the position calculated and is one beacon enough?

The position is calculated from the signals of several beacons and averaged on the map. A single reading may jitter, so the system does not rely on one beacon, but on the set of beacons audible at a given moment. The more beacons within range, the more stable the result.

When designing the network a simple density rule applies. Access roads are covered with beacons about every 100 m, and inside a building there is one beacon per 100 to 200 m2. For warehouse aisles this is a decision about scale: denser where the aisle number or picking zone matters, sparser on long, straight sections of the access road.

Beacons per 1000 m2 of building by the adopted density

Beacons per 1000 m2 of building by the adopted densityBar chart: 10, 6.7 and 5 beacons per 1000 m2 at densities of 100, 150 and 200 m2 per beacon.0246810pcs1 per 100 m2: 10 pcs10 pcs1 per 100 m21 per 150 m2: 6.7 pcs6.7 pcs1 per 150 m21 per 200 m2: 5 pcs5 pcs1 per 200 m2
Source: Example calculation: 1000 m2 divided by the floor area per beacon (rule of 100 to 200 m2, company data)

How accurate is the location and what should you look at when evaluating it?

Accuracy depends on beacon density, the construction of the racking and whether at least two or three devices are in range. In a city project with 11,000 beacons across 95 facilities and 120,000 m2, accuracy is below 1.5 m. A warehouse with different geometry requires its own assessment, which is why a pilot starts with one aisle and one dock, not with the whole hall.

When evaluating, do not ask for one figure in metres. Ask which decision the map has to support. If it is to point to an aisle or a picking zone, a density within the 100 to 200 m2 per beacon range is enough. If it is to distinguish two neighbouring workstations at a dock, beacons are densified only at that spot.

Will this work with the systems we already have?

InnerWeb is an independent system that complements the client's existing systems: access control, time and attendance, HR and ERP. It does not replace them and does not require replacing card readers. Location provides information these systems usually lack: where a given person or vehicle is inside the hall.

In the dock area the vehicle management module handles the choice of gate, dock or warehouse, the driver and the end of the delivery. Integration with the advance notice system over SOAP pre-fills the form from the notice code, so the dispatcher does not retype the data by hand.

Can beacons be installed in explosive atmosphere zones?

The InnerWeb industrial beacon has an industrial design, a CE declaration and an ATEX version for zones 2 and 22. This also applies to warehouses that store aerosols, flammable liquids or dusts. The facility user classifies the zones, and the beacon is selected to match that classification, not the other way round.

Installation practice is the same as in a zone without hazard: recording the identifier, recording the position on the map and recording the place of installation. What differs is the documentation handed to the auditor.

Checklist

Video

Frequently asked questions

Does the system replace access control or time and attendance recording?

No. InnerWeb is an independent, complementary system. It uses data from the existing systems and adds information about the place where a person or vehicle is.

Are new phones or card readers needed for location?

There is no obligation to replace card readers. Beacons are installed in the hall, and the receiver is a phone, a locator or an active card, depending on the workstation.

What happens when the signal from one beacon disappears?

The position is calculated from many beacons, so losing one lowers accuracy at that spot but does not remove the map. Such a beacon shows up in the data as missing detections and is replaced during service.

How do we know the map shows the right place?

The position of every beacon is stored in the database, and correctness is checked after installation and after every change. A duplicated identifier is the most frequent cause of a route jump and has a separate study.

Check location on the map of your warehouse

We will show a pilot on one aisle and one dock. Book a talk or a demo and assess the result on your own route data.

Let's talk