InnerWeb
Skip to main content

Beacons Around Overhead Cranes and Runways: Recommendations for Integrators

The integrator has to set the beacon grid around the overhead crane runways so that the worker's position does not jump between bays. We present six recommendations based on the principles of signal averaging, density per level and keeping database entries in order. The recommendations require validation in the field.

1 per 15 m
assumption for mezzanines
Source: card
8
points per 120 m mezzanine in the example
Source: sample calculation

Why cranes spoil the position

An overhead crane is a moving mass of metal above people's heads. Its structure and bridge move along the hall, changing reflections and radio shadows over time. A beacon visible to the phone at one moment can be blocked the next.

The position of a worker is built from signals of several beacons averaged on the map, not by the method of the strongest signal. This reduces sensitivity to a single change, but only if at every point of the route several beacons are audible from different directions.

Recommendation 1: a grid, not two points at the ends of a runway

In halls, beacon density results from BLE coverage in the presence of metal structures, and two points at opposite edges of the hall do not replace a grid. This also applies to a hall with a crane runway running through the middle.

Adopt the working assumption of 1 point per 225 m2 (15 m grid, minimum 4 points) and mark it on the drawing with the runways. Then densify locally wherever the measurement shows fewer than several audible beacons.

Beacon points in a sample hall with a crane runway

Beacon points in a sample hall with a crane runwayBar chart: 16 points of the hall grid, 8 points of the mezzanine, 24 in total.0510152025pcsHall grid 3,600 m2: 16 pcs16 pcsHall grid 3,600 m2Mezzanine 120 m: 8 pcs8 pcsMezzanine 120 mTotal: 24 pcs24 pcsTotal
Source: Sample calculation: hall of 3,600 m2, 1 point per 225 m2, mezzanine 120 m, 1 point per 15 m

Recommendation 2: space the points on both sides of the runway

If all beacons hang on one side of the runway, the worker's position on the other side relies on signals passing through the bridge structure. Distribute the points alternately on both sides, so that every bay has audible beacons from two directions.

Keep a distance from moving parts and from the working zones of the crane, and mount the points on fixed elements, not on the crane itself. A beacon on a moving structure would change its position relative to the map.

Recommendation 3: count levels and mezzanines separately

Receiving points are counted separately for each level, and a reserve for difficult places is added instead of applying one uniform grid. In a hall with mezzanines along the runway, the rule for mezzanines is 1 point per 15 m of length.

For a 120 m long hall with a mezzanine on one side, this gives 8 points per mezzanine, regardless of the hall grid. This is a sample assumption, and the rule requires validation in the field.

Recommendation 4: do not assume the database knows where a beacon hangs

The route of a vehicle or a person on the map is a path between the positions of beacons recorded in the database. If a beacon was recorded in the wrong place, the route draws a jump even though the worker walked straight.

The true position of a beacon follows from the neighbouring points of the route, not from what the system has recorded. After installation, walk the route along the runway and compare the record with reality, and correct any discrepancies immediately.

Recommendation 5: keep identifiers under control

Two physically different beacons with the same identifier are recognised as one entry, and correcting the entry moves the error to another place. In a large hall with many bays the risk of error grows, because the points look identical.

Introduce a naming scheme that covers the bay, the axis and the height, together with a physical label on each beacon. Avoid copying identifiers when replacing equipment until the old entry has been closed.

Recommendation 6: acceptance after installation on the routes people use

Coverage measurements are carried out after installation and attached to the acceptance protocol. For cranes, choose the routes people actually walk: access paths to workstations, under the runway, next to mezzanines.

Compare the result with the design assumption, and record and explain every position jump larger than the grid spacing before acceptance.

  • drawing of the hall with the runways and bays
  • grid with points on both sides of the runway
  • mezzanines counted separately, 1 point per 15 m of length
  • labels and identifier scheme
  • walking the routes and comparing with the state in the database
  • acceptance protocol with the measurements
Example calculation

Number of points in a hall with a runway and a mezzanine

Assumptions
ParameterValue
Hall area3600 m2
Density assumption for the hall225 m2 per point
Mezzanine length120 m
Assumption for the mezzanine15 m per point

Result: Hall grid: 16 points, mezzanine: 8 points, total 24 beacons without reserve.

Note: Sample calculation; the density rules require validation in the field, and the reserve for difficult places is added separately.

Video

Frequently asked questions

Can beacons be mounted directly on the crane?

We do not recommend it. The beacon position is recorded on the map as fixed, so mounting on moving elements makes the record diverge from reality.

What to do if the position jumps after installation?

Check whether the beacon positions in the database match reality and whether identifiers are unique. Only then densify the grid.

Does the crane runway change the number of points in the grid?

It changes it locally. The base grid follows from the area, and a reserve is added where the measurement shows weak audibility.

Let us design the grid with your integrator

Talk to the InnerWeb team about the beacon grid in halls with cranes. We will help validate it in the field.

Let's talk