Scenario: a hall where the paper plan is not enough
A steel mill hall is a tall space with load-bearing structures, crane runways, mezzanines and large masses of metal. The maintenance manager has to show management that the worker location system will work in this environment before a decision on purchase and installation is made.
The drawing suggests how many beacons are needed, but it does not show how the BLE signal will behave among steel girders. That is why the scenario includes a short on-site coverage survey before the final layout. The approach follows the rule that BLE coverage in steel and reinforced concrete structures is verified by measurement in the field.
Why metal changes the placement rules
Steel reflects and absorbs radio waves, so the same distance between beacons gives different coverage in an office and in a rolling mill hall. In open space coverage is predictable, but among girders, racks and machines radio shadows and reflections appear.
The position of a worker in the InnerWeb system is not based on a single, strongest signal. The phone or watch receives signals from several beacons at once, together with the strength of each one, and the position is averaged on the map. A single reflection therefore does not decide the result, but the condition is a sufficient number of audible beacons at every point of the hall.
Beacons in a sample 4,500 m2 hall: before and after the survey
Step-by-step survey plan
The survey is carried out together with maintenance, occupational health and safety and the integrator, in a window when access to the hall is safe. The goal is not a full design, but confirmation of the density assumptions before installation.
The starting point is the design assumption: for a hall, 1 point per 225 m2 (15 m grid, minimum 4 points), with rules to be validated in the field. Inside buildings the indicative density is 1 beacon per 100 to 200 m2.
- prepare a drawing of the hall with girders, crane runways, mezzanines and built-up zones marked
- hang several test beacons on the working grid, without permanent mounting
- walk the routes people actually use: access paths, workstations, emergency exits
- record how many beacons are audible at each point of the route and at what strength
- mark the places where fewer than three beacons are audible
- correct the grid: denser near structures and mezzanines, sparser in open space
Why two points at the edges of the hall are not enough
A common temptation is to hang beacons on opposite edges of the hall and consider the matter closed. In halls, beacon density results from BLE coverage in the presence of metal structures, and two points at the ends do not replace a grid.
The survey shows this quickly: in the middle of the hall, behind a crane runway and a row of columns, the number of audible beacons drops, and with it the reliability of the position. A record from such a survey is an argument for management, because the decision rests on figures from their own hall, not on a catalogue.
Sample calculation: how many beacons after the survey
Assume a hall with an area of 4,500 m2. According to the assumption of 1 point per 225 m2, this gives 20 beacons in the base grid. These are sample assumptions, not data from a specific plant.
After the survey in three zones behind the crane runways and next to the mezzanines, audibility is weaker, so the manager adds a reserve for difficult places. With an assumption of 6 additional points, the hall needs 26 beacons. The reserve is about 30% of the base grid, and the decision on it is taken on the basis of the survey record, not on intuition.
Conclusions for the maintenance manager
An in-situ survey shortens the road to a reliable offer, because it eliminates two errors: a grid that is too sparse, which produces position jumps, and one that is too dense, which raises cost without benefit. The result goes into the layout design and later into the acceptance protocol.
The system works without GPS, which matters in halls where the satellite signal does not reach. In a steelworks, the environment of cranes, internal transport and liquid metal means that not knowing who a person is and where they should be is a direct risk. That is why it is worth spending one day on a survey before purchase.
Number of beacons in a 4,500 m2 hall after the coverage survey
| Parameter | Value |
|---|---|
| Hall area | 4500 m2 |
| Density assumption | 225 m2 per point |
| Additional points in difficult places | 6 pcs |
Result: 20 base grid points plus 6 reserve points give 26 beacons.
Note: Sample calculation; the figures are assumptions and the rules require validation in the field.
Video
Frequently asked questions
How long does a coverage survey in a hall take?
For a single hall it is usually one working day with the participation of maintenance and the integrator. The exact time depends on the area, the number of mezzanines and the access windows.
Does the survey require stopping production?
Test beacons are hung temporarily, and survey routes are set in agreement with occupational health and safety. Hazardous zones are entered only in windows when access is permitted.
Will the survey results go into the documentation?
Yes. It is worth attaching the coverage record to the layout design, and repeating the survey after installation for the acceptance protocol.
Let us plan a survey in your hall
Book a conversation with the InnerWeb team. We will show how to prepare a BLE coverage survey and turn its result into the number and placement of beacons.
Let's talk