InnerWeb
Skip to main content

Coverage after a hall rebuild or a crane move: checklist for maintenance

When maintenance moves a crane, adds a platform or changes the structure, the way the radio signal propagates in the hall changes too. A transmitter network designed for the previous geometry can produce route jumps and worse range after the rebuild. Below is a checklist that catches this before a worker or dispatcher sees a wrong position.

100-200 m2
transmitter density inside buildings
Source: product card

Why a rebuild breaks the coverage

Transmitter coverage depends on the geometry of the metal. BLE range in steel and reinforced concrete structures is verified by measurement on site, so when that geometry changes, an earlier measurement stops being binding. A moved crane may shade a part of the hall that was well covered before, and a new platform may reflect the signal where it did not reflect before.

The second risk lies in the data. During a rebuild, transmitters are sometimes removed and mounted in other places, and the location database is not always updated. The system then keeps assuming that the transmitter hangs where it used to hang.

Route jumps: a symptom of a wrong transmitter position

The route of a vehicle or a worker on the map is a path between the transmitter positions recorded in the database. If a transmitter is recorded in the wrong place, the route draws a jump: the object leaps to the recorded place, although it is physically somewhere else.

A particularly treacherous case is two physically different transmitters with the same identifier. The system recognises them as a single entry, and moving that entry transfers the error to the other place. When transmitters with a repeated identifier appear in the hall after a rebuild, correcting one point breaks the other.

The real position of a transmitter follows from neighbouring points of the route, not from what the system has recorded. That is why the diagnosis does not trust the entry, but compares it with the place where the transmitter actually sits on the traffic route.

Spacing rule: comparison of assumptions before measurement

Spacing rule: comparison of assumptions before measurementChart: 100, 200 and 225 square metres per transmitter as a reference point for comparison after a rebuild050100150200250m2 per transmitterBuilding, lower range: 100 m2 per transmitter100Building, lower rangeBuilding, upper range: 200 m2 per transmitter200Building, upper rangeHall, design assumption: 225 m2 per transmitter225Hall, design assumption
Source: Placement rules and design assumption from InnerWeb materials; the measurement after the rebuild confirms or corrects them

How to carry out the check after a rebuild

The check starts with a coverage measurement. Coverage measurements are made after installation and attached to the acceptance protocol; after a rebuild they are repeated in the area where the geometry has changed and compared with the earlier result. A drop in the number of audible transmitters at a given place shows that the grid has to be densified.

The second step is a review of the data: the positions of transmitters in the database, the uniqueness of identifiers and their agreement with reality. The third is a test drive or walk along the routes where the structure has changed, observing whether the position on the map jumps. The whole is closed with an entry in the documentation: what was rebuilt, what was measured, what was corrected.

Who is responsible

Most often no owner of this check is named. The rebuild is led by maintenance, the location system is handled by IT or OHS, and nobody connects the two events. The remedy is a written entry in the technical change procedure: every rebuild of a hall or move of a crane triggers a coverage check, and the result goes into the same file as the earlier acceptance protocol.

Checklist

Video

Frequently asked questions

Where does a route jump on the map after a rebuild come from?

Usually from a transmitter recorded in the wrong place in the database. The route is a path between recorded positions, so an error in the record draws a jump.

What if two transmitters have the same identifier?

The system recognises them as one entry, and moving that entry transfers the error to the other place. They need unique identifiers.

How do you know where a transmitter actually is?

The real position follows from neighbouring points of the route, not from the record in the system. It is compared with real movement.

When should the coverage measurement be repeated?

After every change in the metal geometry of the hall, for example after moving a crane or adding a platform.

Let's include coverage control in the procedure

InnerWeb will help you write into the maintenance procedure a check of coverage and transmitter data after every rebuild of a hall.

Let's talk