InnerWeb
Skip to main content

Beacons for a 5000 m2 warehouse hall: estimate for purchasing

A warehouse hall of 5000 m2 needs between 25 and 50 beacons inside the building, and the access road adds more about every 100 m. The purchasing department builds the budget from the number of units, the unit cost including installation and a reserve for events. Below is an example calculation with explicit assumptions, which can be replaced with your own figures.

25 to 50
beacons inside a 5000 m2 building
Source: example calculation
52
units in the example with a 10 percent reserve
Source: example calculation

The density rule: where the number of beacons comes from

The position is calculated from the signals of several beacons and averaged on the map. This method gives a design rule: access roads are covered with beacons about every 100 m, and inside a building there is one beacon per 100 to 200 m2. For a 5000 m2 hall this gives a range from 25 to 50 units, depending on the chosen density.

The choice within that range depends on the goal. To know the picking zone and the aisle number, one beacon per 200 m2 is enough, which means 25 units. When the map has to distinguish neighbouring workstations at a dock, the density of one beacon per 100 m2 is chosen locally, and the rest of the hall is covered more sparsely.

Access road and manoeuvring area

The access road needs a separate count, because beacons are installed along it about every 100 m. A 600 m section therefore requires about seven beacons, counting both ends. Two such access roads come to about fourteen units.

It is worth recording from the start which beacons stand by the road and which inside the building. A beacon by the road that has an indoor position recorded in the database causes a route jump on the map at every delivery. An error in the register costs more than the beacon itself.

Beacons in a 5000 m2 building by density

Beacons in a 5000 m2 building by densityBar chart: 50, 33 and 25 beacons in a 5000 m2 building at densities of 100, 150 and 200 m2 per beacon.01020304050pcs1 per 100 m2: 50 pcs50 pcs1 per 100 m21 per 150 m2: 33 pcs33 pcs1 per 150 m21 per 200 m2: 25 pcs25 pcs1 per 200 m2
Source: Example calculation: 5000 m2 divided by the floor area per beacon

Cost structure for the purchasing department

The budget consists of four items: the devices, installation with recording of the identifier and position, map configuration and a service reserve. The InnerWeb industrial beacon has an industrial design, a CE declaration and an ATEX version for zones 2 and 22, so in warehouses with explosion hazard zones one device type covers the whole hall.

The unit price is set individually. Indicative ranges from 2025 and 2026 deployments are given after the hall has been surveyed; pricing is individual. The calculation below uses one reference value only to show the method and is not a price list.

Example calculation: 5000 m2 hall and two access roads

Assumptions: area 5000 m2, density of 150 m2 per beacon, two access roads of 600 m each, spacing of 100 m, a reserve of 10 percent for replacements and densification, and a unit cost including installation assumed to be 1000 PLN. Building: 5000 divided by 150 gives about 33 units. Roads: 2 times 7 gives 14 units. Total 47 units, with a 10 percent reserve 52 units.

At the assumed unit cost of 1000 PLN the budget for devices with installation comes to about 52,000 PLN. This is an order of magnitude for a simple hall; the actual amount depends on the mounting height, the racking construction and the ATEX requirements.

How to reduce the risk of a wrong budget

Start with a pilot on one aisle and one dock, and calculate the number of beacons for the whole hall from route data, not from the plan. The pilot shows whether a density of 150 m2 is sufficient or whether it must be lowered to 100 m2 locally.

Add to the budget the time of the installer spent recording the identifier and position of each device. The lack of this entry is the most frequent reason for repeated identifiers, and auditing them costs more than the recording itself.

Example calculation

Example calculation: 5000 m2 hall and two access roads

Assumptions
ParameterValue
Hall area5000 m2
Floor area per beacon150 m2
Length of one access road600 m
Number of roads2 pcs
Spacing of beacons on the road100 m
Service reserve10 %
Unit cost including installation (reference value)1000 PLN/pcs

Result: Building 33 units, roads 14 units, total 47; with a reserve 52 units, about 52,000 PLN.

Note: Example calculation based on the assumptions above. The unit cost is a reference value used to show the method, not an offer; indicative ranges from 2025 and 2026 deployments, pricing is individual.

Video

Frequently asked questions

What does the choice between 100 and 200 m2 density depend on?

It depends on what the map must distinguish. An aisle or a zone needs a lower density, while telling apart neighbouring workstations at a dock needs a higher one, usually only locally.

Does the height of storage change the number of beacons?

It affects mounting and range, but the density rule for the building stays at one beacon per 100 to 200 m2. Details are set after the hall has been surveyed.

Does the access road need to be counted separately?

Yes. Access roads are covered with beacons about every 100 m, regardless of the density inside the building.

Is this a price offer?

No. It is an example calculation with explicit assumptions. Pricing is individual and is prepared after the hall has been surveyed.

We will calculate the beacons for your hall

Give us the floor area and the length of the access roads, and we will prepare the calculation and the pilot plan. Book a talk or a demo.

Let's talk