InnerWeb
Skip to main content

Beacon installation checklist for a warehouse: docks, gates, aisles

Most location errors in a warehouse start at installation, not in the software: a duplicated identifier, a position recorded in the wrong place, a beacon by the road with an entry from inside the hall. This checklist guides the installer through the steps at every beacon, from recording the identifier to the entry of the place of installation.

100 m
spacing of beacons on the access road
Source: company data
100 to 200 m2
floor area per beacon inside a building
Source: company data

Before installation: identifier and register

Before a device is hung, record its major:minor identifier and assign it a place in the register. Two physical beacons several hundred metres apart that broadcast the same identifier are recognised by the system as one entry, so the vehicle at either of them is placed in one saved location.

Check in the register whether the identifier is already in use. A new beacon gets an identifier that does not yet exist in the database. This step takes a minute and saves a field visit.

Position: recording in centimetres

The position of a beacon is stored in the database in centimetres, and the map displays it divided by 100. When entering a position from a manual plan, watch the units: an entry in metres treated as centimetres moves the beacon by tens of metres.

The installer records the position at the beacon, not from memory after the end of the shift. Mark the exact place on the plan: pole, aisle number, rack bay.

Density rules at installation

Density rules at installationHorizontal bar chart: 100 m spacing on the road and 100 to 200 m2 per beacon inside the building.050100150200m or m2Road: spacing (m)Road: spacing (m): 100 m or m2100Building: minimum (m2 perbeacon)Building: minimum (m2 per beacon): 100 m or m2100Building: maximum (m2 perbeacon)Building: maximum (m2 per beacon): 200 m or m2200
Source: Company data: access roads about every 100 m, one beacon per 100 to 200 m2 inside the building

Docks and gates: a beacon by the road, not inside the hall

A beacon installed by the road that has an indoor position in the database causes a route jump to that place and back at every delivery that detects it. At a dock or a gate this concerns every truck entering the site.

Ask yourself where the vehicle actually drives past when it detects this beacon. If it is by the gate, the position must be by the gate, even if the device hangs under the roof of the hall.

Aisles: density and repeatability

Inside a building there is one beacon per 100 to 200 m2, and access roads are covered with beacons about every 100 m. In narrow, long aisles keep a regular spacing instead of denser clusters at one end.

Mounting on the steel structure of the racking and near sheet metal affects the range. After hanging the device, check that the phone detects the beacon in the aisle and that the neighbouring beacons are audible at the same time.

Explosion hazard zones and the record of the place of installation

The InnerWeb industrial beacon has an industrial design, a CE declaration and an ATEX version for zones 2 and 22. In warehouses with hazard zones, match the version of the device to the zone classification, and record the zone class for the installer's place entry.

The record of the place of installation contains the identifier, the position, a verbal description, the date and the person who installed the device. Inactive entries are not removed from the database, because the device may start broadcasting again.

Checklist

Video

Frequently asked questions

What happens when two beacons get the same identifier?

The system recognises them as one entry, and a vehicle at each of them is placed in one saved location. Route jumps appear on the map.

Why is the position recorded in centimetres?

That is how the database stores it, and the map divides the value by 100. A unit mix-up moves the beacon by tens of metres.

Can the record of a withdrawn beacon be deleted?

It is not recommended. A device may start broadcasting again, so inactive entries stay in the database.

Prepare beacon installation without errors

We will provide a template installation register and a pilot plan for one dock. Book a talk or a demo.

Let's talk