What do major and minor mean in a beacon?
Major and minor are two numbers broadcast by a BLE beacon, which together form its identifier. The location system matches the detected signal to an entry in the database using exactly this pair, and the entry holds the beacon position on the map. The position is stored in the database in centimetres, and the map displays it divided by 100.
For the administrator the conclusion is practical: the identifier must be unique across the whole installation. If two physical devices broadcast the same major:minor pair, the system has no way to tell them apart.
What are twin beacon entries?
One navigation point may have two beacon entries, so-called twins. They share the minor identifier but have different major identifiers. This happens, for example, after a device is replaced with a new one carrying a different major: the old entry stays in the database and the new one is added next to it.
The live entry is the one that phones actually detect. The other is a spare entry and should not add points to routes. The existence of a twin is not an error in itself; the error is not knowing which of the two is working.
Detected jumps in one site: share of the return trip of one beacon
How do you establish which twin is live?
Count the route points assigned to each of the two beacons. The one that is detected has points and is live. The one with zero detections is the spare. The check does not require a visit to the hall and takes a single query on the data.
Do not delete spare entries. A beacon that is not operating may start broadcasting again, for example after a battery change or when a device is switched on again after being in storage. The entry stays in the database, and its lack of activity is visible in the statistics.
What does the administrator do when two devices broadcast the same identifier?
Two physical beacons several hundred metres apart that broadcast the same major:minor are recognised by the system as one entry. A vehicle detected at either of them is placed in one saved location, so on the map the route jumps to that place and back.
Moving the entry position does not solve the problem. The error is merely moved to the second place in the installation. The real fix is changing the identifier in one of the physical devices, which is field work.
Temporary exclusion from positioning
Until a field visit, a duplicated identifier can be excluded from positioning by changing its major number to a value that no device broadcasts. The position, minor and location stay unchanged, so restoring it means changing one number.
The cost of this step is known in advance: the exclusion covers both twin devices, including the working one. The navigation point is then lost until the field visit.
How do you prevent identifier repetitions?
Before installation, record the identifier of every device and its place of installation in one register. A new beacon gets an identifier that does not yet exist in the database. After installation, check whether route points start appearing only for this entry and not for two.
After every change, check the number of route points recorded over the following minutes: an excluded beacon must not add points, while the others do. This is the simplest test of correctness after an intervention.
Checklist
Video
Frequently asked questions
Are two entries with the same minor always an error?
No. It is a normal situation for twins of one point, provided one is live and the other is a spare. The error starts when two physical devices broadcast the same identifier.
Can the exclusion of an identifier be reversed?
Yes. The exclusion consists of changing the major to an unused value, while the position, minor and location stay. Restoring it means changing one number.
Does fixing a beacon change old routes?
No. Route points are unchanging records of the moment of the signal, so the fix applies only to future deliveries, and old routes keep their jump.
Why not keep the duplicated beacon with a moved position?
Because the error moves to the second place in the installation. The system still cannot tell the two devices apart.
Check the identifiers in your beacon network
We will go through the identifier register with you and the route data. Book a talk or a demo on your own data.
Let's talk