InnerWeb
Skip to main content

Isometric map of the assembly hall: a plant concept

A demo concept for the director of an agricultural machinery plant: a 2.5D map of the assembly hall with buildings, people and work places. We describe what the viewer will see, how the system knows where people are and which data must be entered before the meeting so the map is not empty. This is an offer-stage scenario, not an implementation.

30–60
beacons for a 6,000 m² hall (assumption)
Source: kalkulacja przykładowa
1 per 100–200 m²
beacon density inside a building
Source: karta

Starting point: a demo for the plant director

The scenario concerns an agricultural machinery plant owned by a global group, at the offer and system demo stage. The plant director does not want to look at permit tables. They want to see their assembly hall as they know it: with the building, floors, people and the places where work takes place.

That is why the demo starts with the map. The online map shows the plant in a 2.5D isometric view with buildings, vehicles, people and work places. The 3D map editor describes the buildings, floors and labels, so what the viewer sees comes from data entered earlier by the administrator.

This description is a concept. We do not claim that such a map already works at this plant. We explain what the viewer will see once the plant enters the data and places the beacons.

What is visible on the 2.5D map

The isometric view has one advantage for the director: it shows several floors without switching drawing plans. Elements that a traditional system keeps in separate tools appear on one scene.

Every element matters for decisions. A worker on the map is not decoration, but a position that shows whether the person is in a work place covered by a permit. A work place is not just a point on a plan, but a link to a permit and its status.

  • Buildings and floors, named the way the plant uses them.
  • Workers and vehicles, shown where the beacon signals place them.
  • Work places, meaning locations linked to permits.
  • Labels that describe the areas of the assembly hall.

A permit covering several locations

A permit covering several locations is drawn on the map as one outline of the whole work area, not as a single point. For the assembly hall this matters when a repair affects several stations at once: the director sees the reach of the work, not scattered markers.

Number of beacons in a 6,000 m² hall by density

Number of beacons in a 6,000 m² hall by densityBar chart: at a density of 1 beacon per 200 m² about 30 beacons are needed, and at 1 per 100 m² about 600204060pcs1 per 200 m²: 30 pcs30 pcs1 per 200 m²1 per 100 m²: 60 pcs60 pcs1 per 100 m²
Source: Example calculation: 6,000 m² divided by 200 and by 100

How the map knows where people are

A worker's position comes from the signals of several BLE beacons, averaged on the map, and works without GPS. Inside a building the assumption is 1 beacon per 100–200 m². This is the basic assumption to know before the demo, because the credibility of the map depends on it.

For an assembly hall of 6,000 m² this gives between 30 and 60 beacons in the building. This is an assumption of the example calculation, worked out as 6,000 divided by 200 and by 100. The actual number depends on the structure of the hall, the racking and the fit-out, which is why a site survey is carried out before the offer.

A position built from several signals is averaged, so a single reflected signal or a blocked beacon does not move the marker to the other side of the hall. This is the difference from solutions that rely on a single reference point.

Alarms on the map: a condition that is easy to forget

The most common demo failure concerns alarms. The stillness alarm and the SOS appear on the map only when the location is attached to an alarm template: ALARM for stillness, SOS for SOS. Without this the alarm exists only in the memory of the system, and the viewer will see nothing.

This leads to a simple preparation rule: before the demo, every location where we want to show an alarm must have the right template assigned. Only then does an SOS triggered on the map show a signal for the dispatcher.

Whether the SOS is loud on the open map is decided by the setting of the template, not by its name. A director who hears the signal during the demo should know that it is a configuration, not a coincidence.

Permit templates as the second layer of the demo

The permit flow, meaning the preparatory, main and closing tasks and the automatic closing, follows the template linked to the location. The template is configured in the installation data, without any change to the code.

In a demo for a machinery plant this lets the scenario change during the conversation. If the director asks about the welding bay, no programmer is needed: a location with a different template is enough. The map and the template work together, because the location is the common key for positions, risks and the permit flow.

Data to enter before the demo

An empty map is the worst start to a meeting. The data below should be ready before the director sits down in front of the screen. Collecting it is the task of the administrator and the health and safety specialist, not the director.

Only with this set is scenario M complete: the isometric map, permits from templates, risks assigned to locations, SOS and stillness on the map, and the dispatcher.

  • Description of the building and its floors in the 3D map editor.
  • Location hierarchy: hall, area, line, place.
  • Beacons placed at a density of 1 per 100–200 m² in the building.
  • Alarm templates attached to the demonstration locations.
  • At least one permit from a template linked to a location.
Example calculation

Number of beacons for the assembly hall

Assumptions
ParameterValue
Hall area6000 m²
Lower density200 m² per beacon
Higher density100 m² per beacon

Result: Between 30 and 60 beacons in the building

Note: Example calculation based on the density assumption from the documentation; the actual number depends on the site survey of the hall.

Video

Frequently asked questions

Does the 2.5D map require GPS?

No. The position comes from the signals of several BLE beacons averaged on the map, and it works without GPS, including inside a building.

Why did the SOS alarm not appear on the map during a test?

Most often the location has no alarm template attached. Without it, the alarm exists only in the memory of the system.

Does this description refer to a working implementation?

No. It is a demo concept for a machinery manufacturer, at the offer stage.

Let us see the assembly hall on the map

We will prepare a demo of the isometric map using your plant's data, with locations and the alarm template. We invite you to talk about the demo.

Let's talk