Why the order of building the map matters
The online map shows the plant in an isometric 2.5D view with buildings, vehicles, employees and work places, while the 3D map editor describes buildings, floors and labels. Everything the dispatcher sees on screen therefore comes from work done in the editor.
An administrator who starts by placing transmitters and only then describes the buildings loses time on corrections. Locations, risks and templates are linked through the hierarchy, so its skeleton has to exist at the start.
Recommended order: six stages
The order below follows from the dependencies between elements of the system. Each stage builds on the previous one.
Stage 1: buildings
Start with the outlines and names of the buildings. The names should be the ones the plant uses, because they will appear on permits, on printouts and in messages for the dispatcher.
Stage 2: floors
Describe the floors of each building. The isometric view shows several levels at once, so consistent floor names make orientation easier.
Stage 3: location hierarchy
Hall, area, line, place. Risks are assigned to locations at every level of the hierarchy, so the hierarchy has to exist before the risk catalogue.
Stage 4: labels
Labels describe areas on the map. Use them sparingly, because too much text covers employees and work places.
Stage 5: transmitters
The employee position comes from the signals of many BLE transmitters averaged on the map, and it works without GPS. Inside a building one transmitter per 100-200 m² is assumed. The placement of transmitters is tied to the floors described earlier.
Stage 6: templates and employee location
Employee location is switched on last. Once a location is recognised, the system can attach an employee to a permit at the work place and detach them when they leave, so working time follows the location, not a declaration. This feature works on a ready structure.
Transmitters in a 2,000 m² building by density
How many transmitters for an example building
Assuming one transmitter per 100-200 m², a building of 2,000 m² needs between 10 and 20 transmitters. This is an example calculation based on a stated assumption from the documentation. The real number is set by a site survey, because racks, walls and machines change the range of the signal.
It is worth counting transmitters for each building separately and adding them up, and only then discussing the installation schedule. Floors count separately, because each has its own area.
Typical pitfalls
The most common pitfall is switching on employee location on a map that has no floors yet. The employee appears on the plan without a level, which makes it hard for the dispatcher to judge where they really are.
The second pitfall is names. If a building has one name in the map editor and another on the permit, the issuer looks for it in the wrong place. The rule: one name, the same in every place.
The third pitfall is skipping the alarm template. The stillness alarm and SOS appear on the map only when a location is linked to an alarm template. After the structure is built, link the templates to the locations where the alarm should be visible.
- Buildings and floors first, then locations, transmitters last.
- One name for each building and area across the whole system.
- Labels used sparingly, so they do not cover employees.
- Alarm templates linked to the locations where the alarm applies.
Link to the demo scenario for the assembly hall
The order described here supports scenario M: an isometric map of the hall with transmitters, permits from templates, risks assigned to locations, SOS and stillness alarms on the map, and the dispatcher view. For a machinery plant at the offer stage, this is a concrete list of tasks to complete before the demo, not a description of a finished implementation.
Transmitters for a 2,000 m² building
| Parameter | Value |
|---|---|
| Building area | 2000 m² |
| Lower density | 200 m² per transmitter |
| Higher density | 100 m² per transmitter |
Result: From 10 to 20 transmitters
Note: Example calculation on the density assumption from the documentation; the real number is set by a site survey.
Video
Frequently asked questions
Where should building the plant map start?
With buildings and floors in the 3D map editor, because locations, risks and transmitters rely on that structure.
Does employee location require GPS?
No. The position comes from the signals of many BLE transmitters and works without GPS.
Why does the alarm not show on the map?
The stillness alarm and SOS are visible only when the location has an alarm template linked to it.