How to calculate the number of transmitters from the hall plan
The starting point is the area the system is to cover and the density of transmitters. The worker's position comes from the signals of several BLE transmitters averaged on the map, so a single transmitter is not enough: at least neighbouring points are needed, which together define the position. For buildings, a density of 1 transmitter per 100-200 m2 is assumed.
For an assembly hall of 6,000 m2 this gives a range from two divisions: 6,000 divided by 200 is 30 transmitters, and 6,000 divided by 100 is 60 transmitters. The range of 30 to 60 is the starting point for the concept of a machine plant; the final number is set only by the hall plan with partitions, high racks and zones of different risk weight.
What determines the lower and upper limit
The lower limit, 1 transmitter per 200 m2, works in open spaces with fewer obstacles, where an approximate indication of the hall, a line of workstations or a zone is enough. The upper limit, 1 transmitter per 100 m2, is justified where it matters to distinguish neighbouring workstations, for example for permits covering several locations.
Density should be matched to the function, not to an average for the whole hall. Permit issuing zones, the welding shop and places of hot work may need denser coverage than a component store. In practice the security manager and the IT department set the density map on the hall plan before ordering.
- Hall area and number of floors from the plan.
- Obstacles: partitions, racks, large machines.
- Functions that need more precise location: permits, SOS, immobility.
- Places where the coverage can be thinned out.
Number of transmitters by hall area and density
- 1 per 200 m2
- 1 per 100 m2
What the purchasing budget consists of
The budget for the hall location system consists of several items that the purchasing department should separate in the request for quotation. InnerWeb is a software producer, and the InnerWeb industrial beacon has an industrial design, a CE declaration and an ATEX construction for zones 2/22. The remaining equipment, such as active cards, watches or kiosks, is purchased and integrated.
Separating the items makes it easier to compare offers and to assess what is a one-off investment and what is a maintenance service. Specific amounts depend on the coverage variant, the number of floors and the scope of integration, so pricing is individual; we do not give prices assigned to any party here.
- Transmitters: the number from the density calculation.
- Installation and commissioning: work in the hall, Ex zones, work during plant operation.
- Map configuration: buildings, floors, labels, locations.
- Software licence and modules: permits, SOS, guests.
- Integrations: existing access control, time recording and HR systems.
- Maintenance: battery replacement, service, updates.
A pilot as a way to limit purchasing risk
For a new plant it is sensible to start by covering one zone instead of the whole hall. Two or three zones of different character, for example an assembly line, the welding shop and the permit issuing zone, make it possible to check the density of 1 transmitter per 100-200 m2 under real conditions and correct the plan before ordering the rest.
Such a layout matches the concept for a machine plant, in which the isometric map of the hall with transmitters is the basis for permits, SOS and the dispatcher. This is an implementation scenario, not a description of a completed project. The results of the pilot then turn into the final number of transmitters for the whole hall.
Number of transmitters for a 6,000 m2 assembly hall
| Parameter | Value |
|---|---|
| Area of the assembly hall | 6,000 m2 |
| Lower density (sparser coverage) | 1 per 200 m2/transmitter |
| Upper density (denser coverage) | 1 per 100 m2/transmitter |
Result: 30 to 60 transmitters per hall (6,000 / 200 = 30; 6,000 / 100 = 60)
Note: Sample calculation. The final number depends on the hall plan, obstacles and the functions of the zones; purchase amounts are priced individually.
Video
Frequently asked questions
Will GPS help reduce the number of transmitters?
No. The system works without GPS, and the position comes from the signals of several transmitters averaged on the map. The number of transmitters is therefore set by the coverage density.
Can the transmitters work in explosive atmosphere zones?
The InnerWeb industrial beacon has an ATEX construction for zones 2/22. For other zones the scope is set individually.
Is the number of transmitters the only budget item?
No. The budget also covers installation, map configuration, software licence, integrations and maintenance.
Do 30-60 transmitters apply to every 6,000 m2 hall?
No. It is the range from a sample calculation. A specific hall may need a different number, depending on obstacles and the functions of the zones.