Why an alarm can be invisible on the map
The most common cause is a location that is not attached to an alarm template. The system registers an immobility alarm or an SOS, but the map shows it only if the location where the worker is has the right template assigned. Without this, the alarm exists only in the memory of the system and does not reach the dispatcher's screen.
For the administrator this is a classic configuration error: everything works in laboratory tests, and on the hall the alarm does not appear, because a new location was added later and nobody assigned it a template. That is why attaching templates belongs to the list of tasks for every new location.
Step by step: attaching locations to templates
The rule is simple: ALARM handles immobility, and SOS handles a request for help. Every location where workers may trigger either alarm should have both templates assigned. For the concept of an assembly hall this means in practice all working locations as well as access routes.
- Make a list of the hall locations from the map: workstations, lines, zones, routes.
- For each location assign the ALARM template for immobility.
- For each location assign the SOS template for SOS.
- After adding a new location, repeat the assignment before work starts there.
- Record the date and the person who checked the assignments.
How to count the scope of the check
The number of assignments is the number of locations multiplied by two templates. For an example hall with 12 locations this gives 24 assignments to check. This is a sample calculation; in practice the number depends on how the hall is divided into locations.
Assignments to check by number of locations
Sound of the alarm on the open map
The loudness of the SOS signal on the open map is decided by the template setting, specifically whether sound playback on the map is switched on, not by its name. A template called SOS without sound switched on will not be loud, and a template with a different name and sound switched on will be.
For a dispatcher who does not watch the screen all the time, the sound is the first signal. It is therefore worth verifying the setting in a test, rather than trusting the template name: trigger a test SOS in the chosen location and check whether the map shows the alarm and whether the dispatcher hears it.
Final test and audit evidence
The test on the map should cover every zone of the hall where workers may be alone or in a small group. For the concept of a machine plant, where the hall is covered with transmitters and the dispatcher sees SOS and immobility on the map, the test is the last point before start-up. We describe it as an implementation scenario, not as a completed installation.
The audit evidence is a record of the template assignments and a dated test protocol. The system supports the organisation of calling for help and provides audit evidence that the alarm is visible on the map, but the organisation of the response remains with the plant.
- The test alarm appears on the dispatcher's map in every zone.
- The sound can be heard at the dispatcher's workstation.
- The record of template assignments is in the plant's documentation.
What not to do
Do not assume that an alarm working in one zone will work in the neighbouring one. Do not rely on the template name when assessing the sound. Do not add working locations without templates. For high-risk work (PSZN) remember that closing the work is blocked while more than one worker remains on site; this is a separate check, independent of the alarms.
Number of template assignments to check
| Parameter | Value |
|---|---|
| Locations in the hall | 12 pcs |
| Templates per location | 2 pcs |
Result: 24 assignments to check (12 x 2)
Note: Sample calculation; the actual number depends on how the hall is divided into locations.
Checklist
Video
Frequently asked questions
Will an immobility alarm without a template be saved?
The alarm then exists only in the memory of the system. It appears on the dispatcher's map only in a location with a template attached.
Does the template name affect the sound?
No. The loudness of the signal is decided by the template setting, that is, whether sound playback on the map is switched on.
Do I have to repeat the assignment after adding a location?
Yes. A new location without a template will not show the alarm on the map.
Let us check the alarms on your hall map
In a demo we will show how to attach the ALARM and SOS templates and test the sound at the dispatcher's station. We welcome a conversation.
Let's talk