Why a risk map is needed before ordering location
The location supplier usually asks about floor area and the number of people. More useful questions concern where the zones lie, which way the suppliers drive and where someone works alone. These answers determine where the transmitters must have ATEX design and how densely they must be placed.
The map has a second function too: it allows the current state to be compared with the target state. If the plant knows that after rollout it wants to see people in zone 2 and on the tanker road, it draws this on the plan before talking to the supplier.
Step 1: marking zones from the classification design
The source is the plant's zone classification documents, not one's own estimate. Zones 2 and 22 are places where an explosive atmosphere does not occur in normal operation and, if it does appear, appears rarely and briefly. The division into zones follows Directive 1999/92/EC.
InnerWeb ATEX transmitters are approved for zones 2 and 22. If zones 1 and 21 appear on the map, they must be marked with a separate colour, because certification for those zones is commissioned for the client's installation, without a promise of a deadline. The scope of the zones is verified against the plant's zone classification design.
Example split of road sections by zone (illustration)
Step 2: supplier roads and stopping points
The standard route of tankers and other suppliers is drawn on the plan: gate, weighbridge, loading stand, exit. For each section it is worth noting whether it runs through an Ex zone and where vehicles usually stop for longer. The road is the basis for placing transmitters, because on plant roads the spacing is about 100 m, which gives about 10 units per kilometre.
Transmitters are mounted on poles and structures with ties or adhesive, so the map must show where such points exist. Sections without poles or structures are places where the design will need a separate solution.
Step 3: lone work and places without visibility
The third layer is places where a person works alone or out of sight of colleagues: switchgear rooms, tanks, overpasses, pumping stations. For each one must answer the question of who will notice, and after what time, that something is wrong with the worker.
The system detects stillness in two directions: the phone analyses the sensors, while the server independently measures the time, so the full alarm starts only when both agree. The lone-work layer shows where this mechanism makes the most sense.
Step 4: equipment already in the zone
In Ex zones the plant works with Ex-rated phones (Android 9 or 11, BLE 4.2) and gas detectors with Bluetooth. The InnerWeb concept leaves this equipment in place and adds transmitters and the app. On the map it is worth recording which phone model the worker has in each zone and whether the detector has a Bluetooth interface.
Integrating gas readings from detectors depends on the detector manufacturer's protocol and is a topic for a meeting, not a standard. An evacuation route and an assembly point are not functions of the system: the system shows the list of people and the last position.
Turning the map into an order
The finished map is handed to the supplier together with a short list of questions: which transmitters must be ATEX, how many road sections must be covered, which zones require certification, which phones work in the field. The supplier answers in substance, and the plant can compare offers.
Good practice is to mark one road section and one hall as pilot sites. The result of the pilot adds real coverage to the map, and the following stages extend the scope.
Checklist
Video
Frequently asked questions
Can the location supplier prepare the risk map?
It can help, but the source of the zones is the plant's classification design. The plant should give the supplier its own data, not the other way round.
Can transmitters be mounted in zones 1 and 21?
InnerWeb ATEX transmitters are approved for zones 2 and 22. Certification for zones 1 and 21 is commissioned for the client's installation, without a promise of a deadline.
Does the system plan an evacuation route?
No. The evacuation route and the assembly point are not functions of the system, which shows the list of people and the last position.
Do the Ex phones have to be replaced?
No. The concept keeps the existing Ex phones and gas detectors and adds transmitters and the app.
Sources
Move the risk map onto the pilot plan
Send InnerWeb your zone and road map, and we will propose a road section and a hall for the first location pilot.
Let's talk