Location supplier in an Ex zone: purchasing recommendations

A purchasing department that issues a request for quotation for locating people in zones at risk of explosion rarely has the technical knowledge to assess the answers alone. A list of questions, each of which the supplier must answer with a document or a clear statement, helps. Below are six recommendations for the request-for-quotation stage.

2 and 22
zones for which ATEX transmitters are approved
Source: company card
6
questions to the supplier in the request for quotation
Source: own compilation

For whom and at which stage

The recommendations are intended for the purchasing department and for the technical person who helps assess the offers. They apply to the request-for-quotation stage, the moment when suppliers are still making declarations and the plant can require evidence.

The aim is not to shift responsibility for zone classification onto purchasing. The aim is to get every supplier to answer in the same form, so that the offers can be compared without guesswork.

Recommendation 1: request approval of the transmitters for specific zones

Ask which zones the transmitters are approved for, and request the document. InnerWeb ATEX transmitters are approved for zones 2 and 22. If the plant has zones 1 or 21, certification for those zones is arranged for the client's installation, without a promise of a date.

This distinction matters when assessing offers. A supplier who answers "yes" to the question about zones without saying which zones they mean has not answered the question. The scope of zones is verified against the plant's zone classification design.

Approved transmitter zones versus zones for certification (number of zones)

Approved transmitter zones versus zones for certification (number of zones)Chart: two zones approved (2 and 22) and two zones requiring certification (1 and 21).012zoneApproved (2 and 22): 2 zone2 zoneApproved (2 and 22)For certification (1 and 21): 2 zone2 zoneFor certification (1 and 21)
Source: Company card and the zone split from Directive 1999/92/EC

Recommendations 2 and 3: the plant's equipment and how position is calculated

Recommendation 2: ask whether the solution keeps the existing equipment. In Ex zones the plant works with Ex-rated phones (Android 9 or 11, BLE 4.2) and gas detectors with Bluetooth. The InnerWeb concept keeps this equipment and adds transmitters and an application, which means no cost of replacing the phones.

Recommendation 3: request a description of how position is calculated. The phone receives signals from several transmitters at once, each with its own strength, and sends them every few seconds. The position is averaged on the map, not determined by the rule "the strongest wins". A supplier who describes only the strongest signal uses a simpler method with a different accuracy.

Recommendations 4 and 5: integrations and where the system runs

Recommendation 4: ask about the status of the integration with gas detectors. The integration of gas readings depends on the protocol of the detector manufacturer and is a topic for a meeting, not a standard feature. The supplier should state this explicitly, instead of entering the integration in the feature table as available.

Recommendation 5: check whether the system requires the plant's permit system and where it runs. The location overlay works independently of the plant's permit system, and integration is an option agreed when needed, not a condition for starting. The place where the system runs, the plant's server or the cloud, is chosen by the plant.

Recommendation 6: ask for a description of what the system does not do

The best test of an offer's honesty is a request for a list of things the solution does not do. An evacuation route and an assembly point are not functions of the system: the system shows the list of people and the last known position. A supplier who does not describe this boundary usually promises more than they deliver.

For comparing offers, a table with three columns is useful: the function works today, the function depends on a third party, the function is out of scope. Every function in an offer goes into one column, and empty places need a written explanation.

  • the document approving the transmitters and the indication of zones,
  • the list of the plant's equipment that stays,
  • a description of the position calculation method,
  • an explicit status of the integration with gas detectors,
  • where the system runs and its dependence on other systems,
  • the list of functions out of scope.

Video

Frequently asked questions

Does InnerWeb supply Ex phones?

No. The plant uses its own Ex-rated phones. InnerWeb supplies the transmitters and the application.

Is there a date for certification of zones 1 and 21?

It is arranged for the client's installation, without a promise of a date. The scope of zones is verified against the plant's zone classification design.

Is the gas detector integration a standard feature?

No. It depends on the detector manufacturer's protocol and is a topic for a meeting.

Does the system plan the evacuation route?

No. The system shows the list of people and the last known position. The evacuation route and the assembly point are not its function.

Sources