ATEX transmitters in zones 1 and 21: implementation notes

A gas installation often has zones 1 and 21 in one area, while the location transmitters are approved for zones 2 and 22. This mismatch cannot be closed with a commercial declaration. Below is the sequence of actions for the integrator and the zone designer, from the question about classification to the decision on certification.

2 and 22
zones for which transmitters are approved
Source: company card
3
possible plant decisions on zones 1 and 21
Source: own compilation

Starting point: what is approved today

InnerWeb ATEX transmitters are approved for zones 2 and 22. Zones 2 and 22 are places where an explosive atmosphere does not occur during normal operation, and if it does appear, it is rare and short-lived. The division into zones follows Directive 1999/92/EC.

Zones 1 and 21 are more demanding: an explosive atmosphere can occur there during normal operation. For such places, certification is arranged for the client's installation, without a promise of a date. The first implementation note is therefore to record this fact in the project documents from the start.

Step 1: a query to the zone designer

The scope of zones is verified against the plant's zone classification design. The integrator should not rely on a simplified drawing or on a description from a conversation. The query to the zone designer should include the transmitter layout plan and a request to indicate which mounting points lie in zones 1 or 21.

It often turns out that a large part of the plant road and the buildings fall within zones 2 and 22, while zones 1 and 21 cover a few specific points, such as the surroundings of tanks, loading stands or equipment. In that case the decision concerns a small number of places, not the whole installation.

Sample split of mounting points by zone (sample calculation)

Sample split of mounting points by zone (sample calculation)Horizontal bar chart example: 90 points in zones 2 and 22 and 10 points in zones 1 and 21.020406080100pointsZones 2 and 22Zones 2 and 22: 90 points90Zones 1 and 21Zones 1 and 21: 10 points10
Source: Sample calculation: illustrative assumption of 100 mounting points; the actual split follows the plant's zone classification design

Step 2: three possible decisions

Once the answer is received, the plant has three options. Each has a different effect on the schedule and the budget, so it is worth listing them side by side before the decision meeting.

  • commission certification of transmitters for zones 1 and 21 for the installation, without a promise of a date,
  • skip the points in zones 1 and 21 and cover only zones 2 and 22 with location,
  • apply other measures for these points: a person watching, entry under a permit, a presence read at the entrance to the zone.

A note on measurement in a skipped zone

When points in zone 1 or 21 are skipped, the system knows the last position of a person from before entering such an area. The procedure should state clearly how a person who enters an area without coverage is treated, because the list of people present will show their last known position.

Pitfalls that recur in rollouts

The first pitfall: the assumption that since the transmitters carry an ATEX marking, they can be used anywhere. The marking applies to specific zones and categories, and approval for zones 2 and 22 does not cover zones 1 and 21.

The second pitfall: promising a certification date. Certification depends on an independent body, not on the supplier, so a date cannot be part of the offer. The third pitfall: ignoring the effect on installation. Transmitters are mounted on poles and structures with cable ties or adhesive, with no cables and no mains power, but in a zone requiring certification the mounting method may also be subject to requirements.

The sequence of actions in brief

Record that the approval covers zones 2 and 22. Ask the zone designer to mark the points in zones 1 and 21 on the transmitter plan. Count the points and assess whether certification or a narrower scope makes sense. Decide at a meeting with maintenance, health and safety and purchasing. Only then enter the decision in the schedule, without a certification date if certification has been commissioned.

Video

Frequently asked questions

Can transmitters be mounted in zone 1 or 21?

Not without certification. The approval covers zones 2 and 22, and certification for zones 1 and 21 is arranged for the client's installation.

When will certification be ready?

We do not promise a date. It depends on the certification process and the scope of the installation.

Who determines the zones?

The plant's zone classification design. The scope of zones is verified against this document, not against a description from a conversation.

What about a person entering an area without coverage?

The list of people present shows their last known position. The plant's procedure should define an additional form of control.