The overriding principle: the plant's equipment stays
In Ex zones the plant works with Ex-rated phones running Android 9 or 11 with Bluetooth LE 4.2, and with gas detectors that have Bluetooth. The InnerWeb concept keeps this equipment and adds transmitters and an application. For the head of maintenance, this means no repeat approval of personal equipment.
The first good practice is to list which phone models and Android versions are in use before deciding on the application. Compatibility with Android 9 and 11 and with BLE 4.2 is a condition that is easy to check against the device list.
Practice: position from many signals, not from one
The phone receives signals from several transmitters at once, each with its own strength, and sends them every few seconds. The position is averaged on the map. This has a consequence for the layout design: coverage from several transmitters is needed at every point, not just one transmitter at each entrance.
Transmitters are mounted on poles and structures with cable ties or adhesive, with no cables and no mains power. A spacing of about 100 m on plant roads is chosen for vehicle traffic, and inside buildings the transmitters are placed more densely.
Installation without interfering with the installation
The lack of cables and mains power means the installation requires no electrical work in the zone. For the maintenance department, this is a shorter and simpler scope of work than with cabled solutions.
Transmitter subscription cost by number of units (sample calculation)
Practice: independence from permits and where the system runs
The location overlay works independently of the plant's permit system. Integration is an option agreed when needed, not a condition for starting. This makes it possible to start locating people earlier than an integration project would allow, and it does not tie the schedule to another system.
The plant chooses where the system runs: the plant's server or the cloud. It is good practice to settle this with the IT department before the first pilot installation, because it affects network availability and who maintains the server.
Practice: honest limits of cooperation with the detector
Gas detectors with Bluetooth stay with the workers. The integration of gas readings depends on the detector manufacturer's protocol and is a topic for a meeting, not a standard feature. A good practice is to ask the detector manufacturer for access to the protocol before making a promise in the project.
In the internal project, keep two lists: what the system does today (position of a person, list of people present, alarms), and what depends on a third party (gas readings). The evacuation route and the assembly point are not functions of the system: the system shows the list of people and the last known position.
The cost of transmitters on a subscription
The subscription option for BLE transmitters comes to roughly 7 PLN net per month per unit, for example 100 units for 700 PLN per month. These are indicative ranges from 2025 to 2026 deployments; pricing is individual.
A subscription moves the cost from investment to operation. For plants that plan a pilot on one road or one building, this is a way to start without a large one-off purchase.
Checklist
Video
Frequently asked questions
Do Ex phones have to be replaced?
No, provided they run Android 9 or 11 and BLE 4.2. The plant keeps its own phones.
Does location require integration with the permit system?
No. The overlay works independently, and integration is an option agreed when needed.
How often does the phone send signals?
Every few seconds. The phone receives signals from several transmitters at once and sends them with the strength of each.
What about readings from the gas detector?
Integration depends on the detector manufacturer's protocol and is a topic for a meeting.