Why GPS fails under a pipe rack and transmitters do not
A GPS receiver needs a view of the sky. Under a pipe rack, a loading canopy or a hall roof that view is blocked or reflected. The result is a position shifted by tens of metres, or no position at all. InnerWeb location does not use satellites: it calculates the position from signals of transmitters placed across the plant site.
The employee's phone receives signals from several transmitters at the same time, together with the strength of each one, and sends them to the server every few seconds. The server does not pick one, the strongest transmitter, but averages the position on the map from many readings. In this way a single disturbed signal does not move a person to the other end of the yard.
Does location work on a plant road between units?
Yes, provided the road is covered by transmitters. On plant roads the spacing is about 100 m, which gives about 10 transmitters per kilometre. The transmitters are mounted on poles and structures with cable ties or adhesive, without cables and without mains power, so there is no need to run an electrical installation along the road.
The spacing given in the spec sheets is the starting value for the design. The final layout is set after walking the site, because shielding tanks, walls and steel structures change the signal range. That is why the pilot starts with measurements on the plant's real roads, not with the assumption that one number fits everywhere.
Number of transmitters per 1 km of road at different spacing
How many transmitters are needed in a hall and in a building?
Inside buildings the transmitters are placed more densely than on roads: roughly one transmitter per 100-200 m2 of floor area. For a 5,000 m2 hall this gives a range of 25 to 50 units, depending on how much the interior is divided by walls and racking.
The lower part of the range is assumed for open halls, and the upper part where accuracy at room and zone entrances matters. This is a calculation from an assumed density, not a promise of accuracy: the result is confirmed in the pilot on a selected part of the facility.
- plant road: about 100 m spacing, about 10 transmitters per kilometre
- building or hall: 1 transmitter per 100-200 m2
- 5,000 m2 hall: 25 to 50 transmitters depending on partitions
- mounting on poles and structures with ties or adhesive, no cables
What about precision: is the person on the map exactly where they stand?
The position is averaged from the signals of many transmitters, so its quality depends on the number of transmitters in range and on the surroundings. In densely equipped places the result is more stable than on a section where the phone sees only one or two transmitters. For the operator of the installation, what matters is that the map shows the zone and the road section where the person is, not a point to the centimetre.
In the largest InnerWeb urban project, with 11,000 transmitters in 95 facilities, accuracy was below 1.5 m. Transferring that figure to a fuel plant would be an overstatement: the geometry, the shielding and the spacing there are different. The plant gets its own figure from the pilot.
Are transmitters allowed in an Ex zone?
InnerWeb ATEX transmitters are approved for zones 2 and 22. Certification for zones 1 and 21 is commissioned for the client's installation, without a promise of a deadline, and the zone scope is checked against the plant's zone classification design. Before the operator plans a route through a higher-hazard zone, they should therefore check how that zone has been classified.
In Ex zones the plant usually works with Ex-rated phones with BLE 4.2 and with gas detectors that have Bluetooth. The InnerWeb concept leaves this equipment in place and adds transmitters and the app, rather than replacing the workers' equipment.
Does the system work without mains power and without GPS infrastructure?
Yes. The transmitters need no cables and no mains power, and location needs no satellites. This answers a typical problem of installations where running new supply lines requires permits and work in explosion-hazard zones.
The plant chooses where the system runs: on a plant server or in the cloud. The system works independently of the plant's permit system, and integration is an option set when it is needed, not a condition for starting.
Video
Frequently asked questions
Is a satellite signal needed for location?
No. The position comes from transmitter signals received by the phone and averaged on the map, so a pipe rack or a hall roof does not switch the system off.
How many transmitters are needed per kilometre of plant road?
At about 100 m spacing, about 10 units per kilometre. The final layout is set after walking the site.
Can transmitters be mounted in an Ex zone?
ATEX transmitters are approved for zones 2 and 22. Zones 1 and 21 require certification commissioned for the client's installation, without a promise of a deadline.
Does power have to be supplied to the transmitters?
No. They are mounted with cable ties or adhesive, without cables and without mains power.