Guide: transmitters in a multi-storey building

An integrator preparing a location offer for a multi-storey building needs a repeatable counting method. The geometric method uses 1 unit per 150 m2 per floor and counts stairwells, lifts and galleries separately. Below we show the successive steps and the evidence for an audit.

150 m2
floor area per transmitter in the geometric method
Source: karta
2000
transmitters adopted in the example for about 118 thousand m2
Source: karta

The rule: 1 unit per 150 m2 per floor

The geometric method counts indoor transmitters as 1 unit per 150 m2 per floor. The value sits within the range we generally apply to interiors, that is 1 transmitter per 100-200 m2, but in multi-level buildings a single figure is adopted so that the quotation is repeatable.

A location does not rest on a single transmitter. The position of a person is calculated from the signals of several transmitters and averaged on the map, and the system works without GPS. A density of 1 per 150 m2 is therefore meant to ensure that several transmitters can be heard at every point of a floor, not just one.

Step by step: from the plan to the number

The first step is to collect the plans of all floors with their usable areas. The second is to separate the general area from the separate parts, which are counted differently. Only then comes the division by 150 and rounding up for each level separately.

  • collect the plans of all floors and enter the area of each in m2
  • separate stairwells, lifts and galleries, because they are counted separately
  • divide the remaining area of the floor by 150 and round up
  • sum the transmitters of all floors
  • add outdoor transmitters for the area around the building
  • adopt the final value and record a margin of plus or minus 30 percent

Structure of the example calculation: indoor and outdoor transmitters

Structure of the example calculation: indoor and outdoor transmittersPie chart: 1,875 indoor and 156 outdoor transmitters in the example calculationIndoor: 1875 transmitters (92.3%)Outdoor: 156 transmitters (7.7%)2031transmittersIndoor1875 transmitters (92.3%)Outdoor156 transmitters (7.7%)
Source: Example geometric calculation for about 118 thousand m2 of built-up area

Why stairwells, lifts and galleries are counted separately

Stairwells and lifts connect floors, so a person's position passes from one level to another there. If a transmitter in a stairwell is assigned to the wrong floor, the person shown on the map jumps between levels. That is why these elements need their own transmitters and careful floor assignment.

Galleries, meaning open spaces overlooking a lower level, create a similar problem: the signal reaches two levels at once. Counting them separately makes it possible to plan transmitters there so that the floor can be determined unambiguously.

Example from a facility of about 118 thousand m2

In an example geometric calculation for about 118 thousand m2 of built-up area, the result was 1,875 indoor and 156 outdoor transmitters, and 2,000 was adopted. The most sensitive parameter was the number of floors in the main building: the difference between 4 and 8 levels is about 360 transmitters, and the result varies by plus or minus 30 percent.

The example teaches two things. First, the result is an estimate with explicit assumptions, not a number from a catalogue. Second, adopting a rounded value, here 2,000, is a decision that has to be recorded together with its justification.

Audit evidence: what to record after the calculation

A well-prepared offer includes a calculation sheet from which every number can be reproduced. The client can check it, and after installation compare it with the actual status. Settlement based on the status after installation then limits the risk of wrong assumptions about floors.

An example line of the sheet is: floor name, area, area of stairwells, lifts and galleries, remaining area, the result of the division, and the number after rounding. Such a sheet is the evidence of the method and makes it easier to enter the data into the map editor later.

Video

Frequently asked questions

Is 1 transmitter per 150 m2 a fixed value?

It is the value adopted in the geometric method for multi-storey buildings. In general, for interiors, 1 transmitter per 100-200 m2 is used, and the final density is confirmed by a test on site.

Does the count also cover the area outside the building?

Yes, outdoor transmitters are counted separately. Site roads are served by transmitters about every 100 m, and in the example for about 118 thousand m2 the result was 156 outdoor units.

Does the system need GPS inside the building?

No. The location works without GPS, because the position is calculated from the signals of several transmitters and averaged on the map.

Let us build a calculation sheet for your building

Send us the floor plans and we will prepare a transmitter counting sheet with assumptions that can be verified after installation.