Why stairwells need separate counting
The geometric method counts transmitters inside buildings as one unit per 150 m2 per floor, while stairwells, lifts and galleries are counted separately. The split is justified: a stairwell is not an area to be covered by the grid, but a vertical passage that runs through several levels.
From a security perspective, the stairwell is the evacuation route. If a person walking down the stairs disappears from the map across two levels, the dispatcher loses sight of them exactly when they are needed most.
Recommendation 1: count the floor grid and the stairwells as two separate items
In the tender request and in the cost estimate, list two items: transmitters for the floor grid, and transmitters for stairwells, lifts and galleries. A combined item hides how many of them serve evacuation routes and makes later comparison of offers harder.
When comparing offers, ask whether the supplier counted stairwells separately or included them in the grid. The difference can amount to several dozen units, depending on the number of stairwells and floors.
Sample geometric calculation for about 118 thousand m2 (transmitters)
Recommendation 2: start from the number of floors, not the area
The number of floors of the main building has the largest impact on the number of transmitters. The difference between 4 and 8 floors is about 360 transmitters, and the result varies by ±30%. For this reason the purchasing department should receive the number of floors confirmed by a document from the designer, not an estimate from a conversation.
Each additional floor adds grid cells, as well as the length of stairwell that has to be covered.
Recommendation 3: a counting pattern on an example
In the sample geometric calculation for about 118 thousand m2 of built-up area, the result was 1875 internal and 156 external transmitters, 2052 in total, and 2000 were adopted. The additional 21 units above the sum of the first two items correspond, in this calculation, to items counted separately, such as stairwells, lifts and galleries. This is an interpretation of the example, not a separate figure from the calculation.
Two points are worth remembering from this example. First, the final result was rounded down to a round number, because the accuracy of the calculation does not justify precision to a single unit. Second, stairwells and lifts make up a small fraction of the total, but they matter greatly for safety.
Recommendation 4: check position continuity on the stairs
The position of a person is calculated from signals of several transmitters and averaged on the map, and the system works without GPS. In a building, one transmitter per 100-200 m2 is assumed, but on a stairwell the key is that a person is visible from at least two transmitters on every flight of stairs.
A control walk with a phone up and down the stairwell shows the places where the position jumps or disappears. Record the result in the protocol, with the stairwell number and floor.
Recommendation 5: treat lifts and galleries as separate cases
A lift is an enclosed cabin in which a person may spend several minutes. For security it matters whether, after the doors open, the position matches the floor where the cabin stopped. A gallery, meaning an open walkway above the hall, has the opposite problem: the person is close to transmitters on the lower level, so the position may point to the hall rather than the gallery.
In both cases a practical test matters more than a calculation. Agree with the designer on the list of lifts and galleries, and check each of them during acceptance.
Recommendation 6: state the billing method in the offer
Billing transmitters by the actual state after installation, rather than by an estimate in the offer, reduces the risk of wrong assumptions about floors and stairwells. For purchasing, this is a simple way not to pay for transmitters that are not there, and not to pay extra for missing ones at the last moment.
The contract should state what is counted (units installed and confirmed on the map) and what the protocol looks like. The lack of such a clause usually ends in a dispute in the last week of the deployment.
Video
Frequently asked questions
Why are stairwells counted separately?
Because a stairwell is a vertical passage that runs through several floors, not an area to be covered by the grid. The geometric method counts the grid per floor, and stairwells, lifts and galleries separately.
Does the example of 2000 transmitters apply to every plant?
No. It is an example of a calculation for about 118 thousand m2 of built-up area. For another facility the number is calculated again, and the result varies by about 30%.
When should transmitters be billed?
Preferably by their actual state after installation. This reduces the risk of wrong assumptions about floors and stairwells carried over from the offer stage.
Are you counting transmitters for a building?
We will count the floor grid and the stairwells separately on your floor plan and show the spread of the result. Book a call.
Let's talk