Starting point: the building, the route and the manager's question
The scenario covers a chemical plant building with eight floors and a floor area of roughly 20,000 m2, where 21 groups of equipment are covered by the patrol. The round is carried out by several people during a shift, and the route runs through all levels, stairwells and places without mobile network coverage.
The maintenance manager asks two questions. The first: was the round completed in full, and in what order. The second: where is the person when they report a problem, specifically on which floor. A paper patrol card answers the first question late and the second not at all.
This text is a rollout scenario. The system is presented for a building of this type, so we describe how a pilot would run and which figures were assumed, not results from a finished operation.
Why the floor is a separate problem
Location in a multi-storey building needs more than horizontal coordinates. The person's position is calculated from the signals of several transmitters and averaged on the map, and the system works without GPS. In a building the planning rule is one transmitter per 100 to 200 m2, but that rule applies to each floor separately.
On the online map, a double-click on the building outline opens its interior with a floor selector: P, 1, 2 and so on. The front walls are lowered to 1 m, so the interior of the floor is visible, not only the facade. A double-click on the person opens the building directly on the floor where that person is.
How the system determines a person's floor
The system determines the person's floor in this order: the floor of the location, then the line, then the area. The building outline is taken first from the link with the area, and if there is none, from a point inside the outline. The order matters for the rollout: the more precisely transmitters are assigned to a location on a specific floor, the less the system has to guess.
A condition that is easy to forget
Entering a floor from the online map works only when linking building outlines with area data is switched on. It is off by default, so without this setting the double-click does not show floors. In the pilot scenario this is the first item on the administrator's checklist.
Patrol pilot period (weeks)
Solution: 100 transmitters and installation in two days
The pilot scenario assumes 100 transmitters spread across the whole building. On average that gives 12.5 transmitters per floor, which is an example calculation assuming an even split. In practice more transmitters go to floors with stairwells, technical corridors and places where the patrol route turns.
Transmitters are installed without a power connection and the work takes two days on site. This approach limits intervention in the chemical plant's installations and shortens the window in which the installer needs access to the upper levels. Where the explosion hazard zone requires it, the transmitter version is selected separately for each room.
- Day 1: install transmitters on the lower floors and by the stairwells, and place them on the map.
- Day 2: the remaining floors, a visibility check of the transmitters on the map and a test walk with a phone.
- After installation: assign patrol points to locations on the correct floors.
Offline work: patrolling deep inside halls and on floors without signal
On lower floors and deep inside the building the network signal is weak or absent. That is why offline work matters in the patrol scenario: the person on patrol ticks off points, and tasks and records are sent automatically once coverage returns. The round does not stop because of missing network and does not require walking back to the stairwell just to submit the result.
For the manager this means the patrol report comes from one source, with the time and place of every point, rather than from re-typing paper cards after the shift. The difference is most visible at night, when one person carries out the round.
Average transmitters per floor (example calculation)
Pilot on a real route: 4-8 weeks
The pilot assumes four to eight weeks of work on a real patrol route, without artificial test scenarios. The period is long enough to cover several shifts, different times of day and at least one non-standard situation, for example a stop or a change of route.
During this time three things are checked: whether the position matches the floor at the control points, whether offline work loses no records, and whether the dispatcher finds the person on the correct floor without effort.
Example calculation and the effect of the number of floors
The number of floors in the main building has the largest effect on the number of transmitters. In one example calculation the difference between four and eight levels was about 360 transmitters, and the result varies by around 30% depending on the assumptions. For that reason, in the eight-floor scenario the number of transmitters is treated as a starting point to verify on site, not as a fixed figure from an offer.
Conclusions for the maintenance manager
A patrol across several floors requires three decisions: how many transmitters are needed on each level, whether the online map has the linking of building outlines with area data switched on, and how long the pilot runs so that it covers real changes. The rest is organising the route and training the people on patrol.
It is also worth agreeing with the IT department which data the dispatcher sees during a patrol, and whether the offline record should feed the daily reports. These are small decisions, but they change everyday use more than the number of transmitters does.
Video
Frequently asked questions
Are 100 transmitters enough for every eight-floor building?
No. This is the figure from the scenario assumptions for a building of roughly 20,000 m2. For a different area and floor layout the number is calculated again, and the result varies by around 30%.
What if there is no network coverage on a floor?
The patrol works offline. Records and tasks are sent automatically once coverage returns, so the route does not need stops to submit data.
Why does a double-click on the building not show the floors?
Most often because linking of building outlines with area data is off. It is off by default and has to be switched on in the configuration.
Do you have a building on many floors?
We will walk through the patrol route with you and calculate the transmitters for each floor. Book a call about the pilot.
Let's talk