Costs: 4 or 8 floors means 360 more transmitters

The number of floors in the main building has the biggest impact on the transmitter count: 4 versus 8 levels is about 360 transmitters, and the result can vary by 30 percent. For the purchasing department this is not a technical detail but an item that shifts both installation and monthly maintenance.

360
additional transmitters for 8 instead of 4 floors (example)
Source: karta
±30%
variation of the geometric method result
Source: karta

Why the number of floors matters most

The geometric method counts indoor transmitters as 1 unit per 150 m2 per floor, while stairwells, lifts and galleries are counted separately. Because the count grows with the area of each level, adding a floor adds a full level of transmitters, not a fraction of one.

In an example geometric calculation for about 118 thousand m2 of built-up area, the result was 1,875 indoor and 156 outdoor transmitters, and 2,000 was adopted. Of the assumptions, the number of floors in the main building had the largest effect on the result. The difference between 4 and 8 levels is about 360 transmitters.

How to calculate the difference, step by step

The calculation below is an example meant to show the mechanics, not to price a specific facility. Assume that one floor of the main building corresponds to 90 transmitters at the rule of 1 unit per 150 m2, which gives about 13,500 m2 per level. This value matches the 360-transmitter difference for 4 additional levels.

  • Step 1: determine the area of a typical floor and divide it by 150 m2, this is the number of transmitters per level
  • Step 2: multiply by the number of floors, first for the 4-floor variant, then for 8
  • Step 3: add stairwells, lifts and galleries separately, because they are not included in the floor area
  • Step 4: add outdoor transmitters if the area around the building is also covered by the location system
  • Step 5: apply a margin of plus or minus 30 percent and compare offers for the extreme values

Number of transmitters: 4 and 8 floors with a plus or minus 30% margin

Number of transmitters: 4 and 8 floors with a plus or minus 30% marginBar chart: for 4 floors 252, 360 and 468 transmitters, for 8 floors 504, 720 and 936 transmitters02004006008001000transmittersLower limit (4 floors): 252 transmitters252Base value (4 floors): 360 transmitters360Upper limit (4 floors): 468 transmitters4684 floorsLower limit (8 floors): 504 transmitters504Base value (8 floors): 720 transmitters720Upper limit (8 floors): 936 transmitters9368 floors
  • Lower limit
  • Base value
  • Upper limit
Source: Example calculation: 90 transmitters per floor (1 per 150 m2), plus or minus 30% margin

What the cost of additional transmitters consists of

Each additional transmitter is not only the price of the device. It also includes installation on site, configuration in the map editor, assignment to a floor, and later maintenance, meaning status checks and replacing batteries or power supplies. With 360 extra units, labour and maintenance items grow fastest, because they scale with the number of devices.

Unit values depend on the execution, the zone and the power supply method, so we do not give them here: they should come from the offer. A tender request should be built so that the unit price is shown separately. Then the difference between 4 and 8 levels can be calculated by multiplication, without a new quotation.

The plus or minus 30 percent margin: how to build it into the budget

The result of the geometric method varies by plus or minus 30 percent, because building plans are often approximate and some areas (shafts, cells, ducts) need decisions on site. For the 8-level variant, which gives 720 transmitters in our example, the range is about 504-936 units. For 4 levels (360 units) it is about 252-468.

In the purchasing budget it is reasonable to assume the middle value as the base and to reserve the upper limit separately as a conditional item. The condition for releasing the reserve should be written down: the status after installation, not an estimate from the offer.

Maintenance: what changes after installation

After installation, the number of transmitters affects routine inspections. More levels mean more inspection routes, but also a higher density of location data. In a multi-storey building it is worth comparing the annual maintenance cost with the purchase cost, because over a long period of operation maintenance is often a significant part of the total cost of ownership.

When comparing offers, ask about two things at once: the implementation price per level and the annual maintenance cost per level. An offer with a lower purchase price but a higher maintenance cost is hard to call cheaper over a horizon of several years.

Example calculation

Example: the difference between 4 and 8 floors

Assumptions
ParameterValue
Counting rule1 transmitter per 150 m2 per floor
Area of a typical floor (example assumption)13500 m2
Transmitters per floor90 units
Variant A4 floors
Variant B8 floors
Result margin30 percent

Result: Variant A is 360 transmitters, variant B is 720, a difference of 360 units (plus or minus 30 percent range: A 252-468, B 504-936). Stairwells, lifts and galleries are counted separately on top of this.

Note: Example calculation based on the assumptions above, without prices. Indicative ranges from 2025-2026 deployments; individual quotation.

Video

Frequently asked questions

Does every additional level always add the same number of transmitters?

Only if the floors have a similar area. With floors of different sizes, each one is counted separately using the rule of 1 unit per 150 m2, and stairwells, lifts and galleries are added separately.

Where does the figure of 360 units of difference come from?

It results from the example geometric calculation. With a different floor area the difference will be different, so it is worth providing the floor plans in the request, not just the number of floors.

Does the plus or minus 30 percent margin mean the offer is uncertain?

It means the estimate before installation has limits, and settlement based on the status after installation removes them. This is a good purchasing practice, described separately in the article on offers with an uncertain number of floors.