FAQ: IP rating of transmitters in an industrial plant

Purchasing teams receive an IP code with two digits in supplier offers and have to turn it into a requirement in the procurement specification. We have collected the questions that come up most often when buying transmitters for halls, yards and cold stores, with answers based on IEC 60529 and on the approval documents of InnerWeb beacons.

What do the two digits after IP mean?

The first digit describes protection against solid objects, including dust, and the second digit describes protection against water. According to IEC 60529, digit 6 in the first position means dust tight, and digit 7 in the second position means resistance to temporary immersion.

The code IP67 therefore means an enclosure that is dust tight and resistant to temporary immersion. These are two independent parameters: a device can be very well protected against dust and at the same time less protected against a water jet, which is why both digits must always be stated in the specification.

The IP rating applies to the enclosure as delivered, with seals correctly fitted. A damaged gasket or an element that is not fully tightened reduces the real protection below the declared level.

How should the IP rating be written in the procurement specification?

The most reliable approach is to write the requirement in three parts: the minimum IP code with a reference to IEC 60529, the place of installation (hall, yard, cold store, paint shop) and the document with which the supplier must confirm the requirement. The phrase "waterproof" or "for harsh conditions" alone gives no basis for acceptance.

The InnerWeb industrial beacon holds approvals covering IK and IP testing as well as a Bluetooth licence. You therefore receive documents with the offer, not just a declaration in the catalogue. When ordering, request copies of these documents and attach them to the purchasing file.

  • Required IP code with the reference to IEC 60529.
  • Place and method of installation, for example a pole, steel structure or wall.
  • Required confirming document: test report or manufacturer's declaration.
  • Acceptance criterion: visual inspection of seals and no traces of water or dust inside after the trial period.

Highest digits of the IP code in a typical IP67 requirement

Highest digits of the IP code in a typical IP67 requirementHorizontal bar chart: first code digit 6, second code digit 702468level (code digit)Protection against dust (6 =dust tight)Protection against dust (6 = dust tight): 6 level (code digit)6Protection against water (7 =temporary immersion)Protection against water (7 = temporary immersion): 7 level (code digit)7
Source: IEC 60529, meaning of the IP code digits

Is IP67 enough in a potentially explosive atmosphere?

No. The IP rating describes protection against dust and water, while explosion protection is confirmed by a separate assessment in line with Directive 2014/34/EU. These are two different documents and both are needed if the transmitter is to work in zone 2 or 22.

The InnerWeb beacon has ATEX certification for zones 2 and 22, confirmed by testing at a notified technical safety body. Zone 2 means that an explosive gas atmosphere occurs rarely and only for a short time, and zone 22 applies in the same way to combustible dust.

Older industry materials and some of our earlier descriptions mention zones 0, 1 and 2. The valid scope of the beacon's certification is zones 2 and 22, and only this scope should be entered in the request for quotation.

Which IP rating should be chosen for a hall, a yard and a cold store?

Selection starts with the question of what actually reaches the enclosure. In a dry storage hall the main threat is dust from forklift traffic, on a storage yard it is rain and snow, in a cold store it is condensation at transitions between temperatures, and in a washing bay or paint shop it is water under pressure or solvent vapours.

If you are not sure, write the requirement for the most demanding place where the transmitter will hang and ask the supplier for the document. One enclosure class across the whole network simplifies spare parts and service, because a replacement transmitter fits every position.

  • Dry hall: protection against dust as the priority.
  • Yard and gantries: dust and water, including heavy rain.
  • Cold store: condensation and freeze-thaw cycles.
  • Ex zone: a separate ATEX requirement in addition to the IP code.

Is the enclosure alone enough for the network to work in humidity and dust?

The enclosure protects the electronics, but the quality of the network also depends on the transmission power and on the placement. Calibrating the transmission power to the hall is done after installation, because it reduces interference between transmitters and extends battery life.

We do not give battery life as a guarantee, because it depends on power, transmission frequency and temperature. For this reason do not write a demand for a specific number of years of battery life as a guaranteed parameter in the order. Instead, require a battery replacement service as part of the network maintenance.

Which documents should be attached to the purchasing file?

The purchasing file should contain a complete set that will later support an audit and any inspection: the CE declaration of conformity, the ATEX document for Ex zones, the protocol or certificate from IP and IK testing, confirmation of the Bluetooth licence and a description of the installation points with the required IP code marked.

Such a set is evidence of due diligence in selecting equipment, but it does not replace the explosion risk assessment carried out for the given plant. The classification of zones is decided by the plant, not by the transmitter supplier.

Video

Frequently asked questions

Does IP67 mean the transmitter can be permanently submerged in water?

No. Digit 7 means resistance to temporary immersion under specified test conditions, not continuous operation under water. If the transmitter is to hang in a place that is permanently flooded, ask the supplier for a higher rating or a separate confirmation.

Must the supplier attach an IP test protocol?

It can be requested in the order. The InnerWeb industrial beacon holds approvals covering IK and IP testing, so the documents are available. Enter them into the acceptance criteria.

Is the IP code enough in a paint shop?

No. A paint shop needs a separate explosion protection requirement if the zone is classified as hazardous. The ATEX transmitter covers zones 2 and 22.

Who is responsible for classifying the zones?

The plant, on the basis of its own explosion risk assessment. The transmitter supplier states the scope of the device's certification and the documents, but does not classify zones at the customer's site.

Sources