Recommendation 1: start with the zone classification at your own site
Whether zone 1, 2, 21 or 22 applies to a given place in the paint shop is decided by the plant's explosion protection document, not by the equipment supplier. Directive 2014/34/EU sets requirements for equipment and protective systems for use in potentially explosive atmospheres; zones 2 and 22 mean rare and short-lasting hazard from gas and dust respectively.
Before you plan the network, collect the plan of the paint shop with the zones marked on it. The radio beacon design covers zones 2 and 22. If a zone with a higher hazard applies to a given place, no transmitter is mounted there, and coverage is designed from outside the zone or with another solution.
Recommendation 2: state the ATEX scope only as zones 2/22
Older materials showed zones 0, 1 and 2. The current scope of the radio beacon design is zones 2 and 22, and only this scope is entered in inquiries, specifications and contracts. A discrepancy in the plant's internal documents can delay acceptance.
The ATEX design has been confirmed by testing at a technical safety body, and the approvals also cover IK and IP tests and the Bluetooth licence. For offers for Ex zones, the CE declaration and the ATEX document are attached, so request them as a complete set before approving the purchase.
Number of transmitters for a paint shop (1 per 100-200 m²)
- 1 per 100 m²
- 1 per 200 m²
Recommendation 3: do not replace employees' equipment unnecessarily
In an offer for explosive atmosphere zones, the plant keeps its Ex phones and detectors and adds transmitters and the application instead of replacing employees' equipment. For the maintenance team this means a shorter list of changes in the Ex documentation and less equipment to reassess.
The rule is simple: the transmitter network is added to the existing fleet of devices, and new elements in the zone have their own documents. The phone with the application remains the employee's device, so its admission to the zone does not change because of the location system.
Recommendations 4 and 5: spacing and mounting without mains power
Radio beacons are placed about every 100 m along plant roads, and in a building 1 transmitter per 100-200 m². For a paint shop of 1,200 m² this gives 6-12 units as the starting point. The spacing is corrected after a test walk, because racks, booths and partitions affect coverage.
Transmitters are mounted on poles and structures with cable ties or adhesive, without cables and without mains power. In a paint shop this matters, because work on the electrical installation in a zone requires additional permits, whereas fixing with a cable tie can be planned in the line's stoppage window.
Recommendations 6 and 7: acceptance and documentation for the audit
At acceptance, check the complete set of documents, the zone marking on the transmitters, the conformity of the mounting places with the zone plan and the result of the test walk. The document should indicate which transmitters lie in zone 2 and which in zone 22.
Attach to the maintenance records the layout plan, the CE declaration, the ATEX document and the battery replacement schedule. Such a set supports documentation requirements and provides evidence for an audit, but it does not replace the explosion risk assessment carried out by the plant.
Number of transmitters for a paint shop
| Parameter | Value |
|---|---|
| Paint shop area | 1,200 m² |
| Recommended density | 100-200 m² per transmitter |
Result: 6-12 transmitters as the starting point
Note: Sample calculation based on the assumptions in the page text; not an offer, individual quotation applies.
Checklist
Video
Frequently asked questions
Can a radio beacon be mounted in zone 1 or 21?
The InnerWeb radio beacon design covers zones 2 and 22. A transmitter is not mounted in a zone with a higher hazard, and coverage is planned from outside the zone.
Do Ex phones have to be replaced?
No. The plant keeps its Ex phones and detectors and adds transmitters and the application instead of replacing employees' equipment.
Which documents are attached to an offer for Ex zones?
The CE declaration and the ATEX document, with the scope stated as zones 2/22.