First the description of the environment, then the product
Start with a description of the environment at the installation site: temperature, humidity and condensation, type of dust, contact with water and the classification of the explosive atmosphere zone. Only from this description do the requirements for the equipment follow.
The mistake that costs the most is buying equipment "for industry" and only then checking whether it fits a specific hall. The environment description should be an attachment to the request for quotation.
IP protection rating
The required IP code is written with a reference to IEC 60529. The first digit describes protection against dust, where 6 means dust tight, and the second describes protection against water, where 7 means temporary immersion.
The InnerWeb beacon holds approvals covering IK and IP testing. Request copies of them during the procedure so that you assess a document, not a commercial declaration.
IP code digits required for dust and temporary immersion
Ex zone: ATEX 2/22
Directive 2014/34/EU sets out requirements for equipment and protective systems for use in potentially explosive atmospheres. Zones 2 and 22 mean a rare and short-term hazard, from gas and dust respectively.
The valid certification scope of the InnerWeb beacon is zones 2 and 22, confirmed by testing at a notified technical safety body. Offers for Ex zones come with a CE declaration and an ATEX document. Older materials mention zones 0, 1 and 2, which do not apply.
In hazardous zones the plant may keep its Ex phones and detectors and add transmitters and the application, instead of replacing employees' equipment.
Power supply, batteries and frost
Check the method of power supply: battery powered without intervention in the electrical installation, or mains powered with cabling. In continuous-operation plants, battery power is sometimes a condition for access to the site.
Do not treat battery life as a guaranteed parameter. Require a battery replacement service, monitoring of correct operation and support. The indicative maintenance cost is PLN 7 net per unit per month, price quoted individually.
Documents and service
The complete set of documents includes the CE declaration of conformity, the ATEX document, the protocols from IP and IK testing and confirmation of the Bluetooth licence. Add a service plan: who responds, how often and within what time to a report.
A good buyer also checks what happens when mobile devices change. In a transmitter network a change of phones should not require rebuilding the network, and this is the case with InnerWeb beacons.
How to use the list when comparing offers?
For each offer fill in the same list and enter the document that confirms each point. An offer without a document for a critical point, for example ATEX, does not proceed to the price evaluation.
Keep the result in the purchasing file. This makes a later audit easier and supports the demonstration of due diligence in selecting equipment.
Checklist
Video
Frequently asked questions
Does the IP code replace ATEX?
No. The IP code describes protection against dust and water, while ATEX concerns potentially explosive atmospheres and follows from Directive 2014/34/EU.
Which zones does the InnerWeb beacon cover?
Zones 2 and 22. Offers for Ex zones come with a CE declaration and an ATEX document.
Should batteries be purchased separately?
In the maintenance offer, battery replacement is part of the service, alongside monitoring and support.
What should be done if the supplier has no document?
Exclude the item from the price evaluation. Treat a commercial declaration alone as insufficient for critical parameters.