What the cost per wristband consists of
The amount per wristband is not the price of the device. It is the total cost of the whole solution divided by the number of worn wristbands. The quote covers the site survey, BLE propagation measurements, layout design for each floor, integration with the OT network, system adjustments and training. The wearable devices and the receiver network are only part of that total.
- site survey and BLE signal propagation measurements across the grounds
- receiver layout design, prepared separately for each floor
- receiver network: main antennas and small local antennas
- integration with the OT network and the client's servers
- system adjustments and training
- wristbands worn by employees
Assumptions: what area the calculation covers
The assumptions come from a location concept for a large energy site: thousands of employees, several dozen hectares and several dozen buildings. In that concept the receiver network counted a few thousand points, including about 13% main antennas connected via LAN and PoE, while the rest were small BLE antennas powered from 230 V.
Why points are counted separately for each floor
BLE signal passes poorly through ceilings, so what works on the ground floor is not enough on the first floor. About 88% of the points in the concept were inside buildings and were counted separately for each floor, and about 12% were outdoors. Counting by building volume would give a lower cost, but the client would end up with coverage gaps.
What the 13% reserve is for
The reserve covers points that cannot be mounted exactly where the design planned them, as well as adjustments after measurements on the client's site. It is built into the price from the start and is not billed as an extra charge when the implementation reveals that one building needs a few more points.
What the wristband does and how the data flows
In this concept the BLE wristband only transmits and is charged once a year. It has an alarm for removal or cutting of the strap and an SOS button. The required accuracy was 10 m. Data flowed only through the main antennas to the OT VLAN and to servers in the OT network, with no path to the office network.
One-off cost by number of wristbands (thousand PLN)
Example calculation per wristband
The calculation below is an example with explicit assumptions, not an offer. It takes the concept's figures of around PLN 500 one-off and about PLN 5 per month per wristband, and scales them to three wristband counts to show the order of magnitude of the project.
For 1,000 wristbands the one-off cost is about PLN 500,000 and the monthly cost about PLN 5,000. For 2,000 wristbands it is about PLN 1,000,000 and about PLN 10,000 per month, and for 3,000 wristbands about PLN 1,500,000 and about PLN 15,000 per month. The figures are indicative ranges from 2025-2026 implementations; individual pricing applies.
What changes the amount per wristband
The same order of magnitude can end up much higher or lower. Three factors make the biggest difference and are worth settling before a request for quotation.
Number of floors and their area
The more floors in the buildings and the smaller each floor, the higher the overhead per receiver point per person. Terrain with dispersed, low buildings costs less per point than a single multi-storey technology block.
Accuracy requirement
A 10 m accuracy requires fewer points than accuracy below 5 m. Before anyone demands higher accuracy, ask what it is for: identifying the building and floor usually needs less than identifying a specific switchgear room.
Device trust procedure
A critical infrastructure operator may require a device trust procedure: X-ray inspection of samples, firmware and key checks. The procedure has 12 steps and addresses supply chain risks, so its cost has to be included in the quote rather than added after the samples are received.
Split of receiver network points at 3,000 points
How to prepare a request so the quotes are comparable
Offers can only be compared if every bidder received the same assumptions. The request should require counting the receiver network per floor, the reserve percentage, the required accuracy, the way points are powered, and a statement that data goes only to the OT network.
Location cost for 2,000 wristbands on a large energy site
| Parameter | Value |
|---|---|
| Number of wristbands | 2,000 pcs |
| One-off cost per wristband | 500 PLN |
| Monthly cost per wristband | 5 PLN/month |
| Receiver network points including the reserve | 3,000 points |
| Network reserve | 13 % |
Result: Approx. PLN 1,000,000 one-off and approx. PLN 10,000 per month, that is approx. PLN 120,000 per year in maintenance.
Note: Example calculation based on the assumptions above. Indicative ranges from 2025-2026 implementations; individual pricing after a site survey and propagation measurements.
Video
Frequently asked questions
How much does location cost per wristband on a large energy site?
In the example calculation it is around PLN 500 one-off and about PLN 5 per month. The amount covers the site survey, receiver network design, OT integration and training, not only the wristband itself.
Why are points counted separately for each floor?
BLE signal passes poorly through ceilings, so each floor needs its own receiver points. Counting by building volume would give a lower cost, but incomplete coverage.
Is the 13% reserve an extra charge?
No, it is built into the receiver network from the start. It covers points added after measurements, without billing them separately during the implementation.
Is this amount an offer for our site?
No. These are indicative ranges from 2025-2026 implementations; individual pricing follows a site survey and measurements.
Let us calculate the receiver network for your site
After a site survey and propagation measurements we will prepare a quote per floor and per wristband. Write to us to arrange a site visit.
Let's talk