Where the servers stand and whether the system needs a vendor connection
The energy sector client may require the system to work locally in the OT network, without a connection to the vendor. This is a usual expectation, not an exception, and the location design should meet it from day one, not as a patch added during acceptance.
Can the servers sit in the client's network rather than at the vendor?
Yes. A critical infrastructure operator usually asks where the servers run and expects the answer: at the client, in the OT network. InnerWeb is a software vendor, and its software can be run at the client's site, not as a service dependent on the vendor's cloud. Employee location data does not have to leave the facility.
What about updates when there is no vendor connection?
Updates follow a mode agreed with the IT department: a package delivered on a medium or through a channel approved by the client, after prior checking in a test environment. The schedule and the responsibility for the service window are written into the contract, not decided on the day of deployment.
Who holds the keys and what device trust looks like
The client may require frames signed with its own keys and a device trust procedure, meaning X-ray inspection of samples and checks of firmware and keys. These are supply chain questions, not questions of convenience, and the answer has to be specific.
Can wristband frames be signed with the client's keys?
Yes, this is one of the typical requirements in energy sector tenders. The signing keys stay with the client, so neither the wristband manufacturer nor the integrator can impersonate the device on the facility network.
What does a critical infrastructure operator ask about the wristband?
Questions cover four matters: the origin of the electronics, who holds the firmware keys, whether the wristband lasts without daily charging and where the servers run. Each has an answer in the documentation that the IT department receives before the pilot, not after the contract is signed.
IT and OT questions by topic (sample calculation, number of questions per meeting)
Outbound traffic and firewalls
Many OT networks block outbound traffic from an application host. For a system that must send alarms to people and to other systems, this is a design constraint that has to be taken into account before anyone installs the server.
What happens to an alarm when the network does not allow outbound traffic?
When the client's network blocks all outbound traffic from the application host, alarm webhooks are saved in a persistent queue. An external poller collects them through an inbound channel, so the alarm is not lost and the firewall does not have to be opened. The client decides where the poller stands and keeps full control over it.
Do firewall ports have to be opened for the location system?
The scope of opening depends on the architecture. In the OT approach, data from beacons and wristbands leaves only through the main antennas to a separate VLAN and to servers in the OT network. There is no direct path from worn devices to the office network or to the internet.
What the heartbeat carries and how the IT department sees it
The IT department usually wants to see what actually flows through the network. The heartbeat of a beacon or card carries signals from received transmitters, signal strength, battery and status. From it the system calculates the employee's position in real time.
What does the system use the heartbeat for?
The heartbeat feeds the view of who is on site, the automatic attachment and detachment of permits, and detection of no movement. This is one frame serving several functions, so the IT department assesses one data stream, not five separate ones.
Does measurement depend on Wi-Fi?
Not always. Pulses from active LoRa cards go to the same no-movement mechanism as data from the app, and a LoRa bridge translates the frames into the existing API. A watch or card then works without Wi-Fi, which matters in switchgear rooms, where wireless networks are normally not installed.
How to draw it for the IT department: the PERA model
The architecture of the system in the OT network is presented in the PERA model, with levels 0-6 and DMZ 3.5. The drawing answers the questions the IT department asks about each new system: what sits in which zone, what talks to what and where the firewalls are.
- OT network separated by firewalls
- no hosts with interfaces in two levels
- separate VLANs for management, backup and monitoring
- logs sent to a SIEM
- remote access through VPN with 2FA and a jump host in the OT DMZ
Video
Frequently asked questions
Where do the servers of the location system run in a power plant?
At the client, in the OT network. The system can work locally without a connection to the vendor, which is a frequent requirement of energy sector clients.
Who holds the keys for signing wristband frames?
The tender requirement concerns the client's keys. They stay with the client, and the device trust procedure covers firmware and key checks.
What about the alarm when a firewall blocks outbound traffic from the application server?
Alarm webhooks are saved in a persistent queue, and an external poller collects them through an inbound channel. The alarm is not lost and outbound traffic does not need to be opened.
Does the location system need Wi-Fi in switchgear rooms?
No. Active LoRa cards send pulses through a LoRa bridge to the existing API, so no-movement measurement works without Wi-Fi.
IT and OT technical meeting
We will prepare for your team a PERA diagram and answers on servers, keys and firewalls. Tell us when to invite us to a talk.
Let's talk