What the inspector accepts and on what assumptions
The inspector accepts a receiver network which, in the location concept for a large energy site, counted several thousand points. About 13% were main antennas with LAN and PoE, and the rest small BLE antennas powered from 230 V. About 88% of points were inside buildings and counted separately for each floor, and about 12% were outdoors.
The reserve was 13% and the required accuracy 10 m. Acceptance therefore checks not only whether everything stands, but whether the proportions and assumptions of the design are kept in the field.
Main and local antennas
The split into main and local antennas determines the route by which data leaves the site. Main antennas have LAN and PoE, and small BLE antennas are powered from 230 V. From the inspector's point of view these are two separate sets of checks.
Main antennas: LAN, PoE and the data path
Check that each main antenna has a LAN connection and PoE power as designed, and that data from the wristbands leaves only through them. This configuration is a condition for data to reach the OT VLAN and the servers in the OT network, and not the office network.
Local antennas: 230 V power
Small BLE antennas have no link of their own and must have 230 V power. Check the protection of the sockets, and whether a lack of power at one point is visible in the system as a lack of readings, not as a silent lack of coverage.
Placement of points: buildings and outdoors (%)
Points per floor and the 13% reserve
BLE signal passes poorly through floor slabs, which is why points in buildings are counted separately for each floor. Acceptance checks this division in the field, not on the drawing.
Does each floor have its own points?
Walk each floor with the list of points from the design and tick each one that stands in its place. Missing points on a chosen floor cannot be made up with an excess on the floor above or below, because reading through a slab is too weak to determine position.
Was the 13% reserve kept?
The reserve covers points that turn out to be needed after measurements. Check how much of it was used during deployment and how much remains for expansion. A reserve exhausted before acceptance means the design was too optimistic, and changes must be discussed with the contractor.
10 m accuracy and position conditions
A 3D position requires readings from at least 5 transmitters. Signal strength is normalised with a factor of 110 and averaged over up to 4 readings. These are parameters the inspector checks in the system settings, not on site.
The 10 m accuracy test consists of walking a defined route with a wristband and comparing the position on the map with the real location. The heartbeat carries signals from received transmitters, signal strength, battery and status, so in case of a discrepancy one can see which points the readings came from.
Type of antennas in the receiver network (%)
OT VLAN and acceptance documentation
Data leaves only through the main antennas to the OT VLAN and to servers in the OT network. The architecture is presented in the PERA model, with levels 0-6 and DMZ 3.5, with separate VLANs for management, backup and monitoring, and logs to a SIEM. The inspector compares the actual configuration with the diagram.
The cost of the concept covered the site survey, BLE propagation measurements, floor-by-floor layout design, integration with OT, system adaptation and training. The acceptance protocol should refer to each of these elements, so that the buyer has a complete set of documents after the deployment is finished.
Checklist
Video
Frequently asked questions
Why does acceptance count points separately for each floor?
BLE signal passes poorly through floor slabs, so an excess of points on one floor does not replace a missing one on another.
How many transmitters are needed for a 3D position?
At least 5. Signal strength is normalised with a factor of 110 and averaged over up to 4 readings.
How do I check 10 m accuracy?
Walk a defined route with a wristband and compare the position on the map with the real location. If they differ, the heartbeat shows which points the readings came from.
Which way does data leave the receiver network?
Only through the main antennas to the OT VLAN and to the servers in the OT network.