Cost of maintaining a transmitter network over 4 years

The plant director does not only ask about the installation price, but about what the transmitter network costs over its whole service life. The indicative maintenance cost is PLN 7 net per unit per month, which gives PLN 336 net per unit over 4 years. Below we break down what this amount covers and how to put in your own number of transmitters.

What does the monthly maintenance cost cover?

Maintenance of the transmitter network covers battery replacement as part of the service, monitoring of correct operation and ongoing support. The indicative cost is PLN 7 net per unit per month. These are indicative ranges from deployments in 2025 and 2026, and the price is quoted individually.

For the plant this means one budget line instead of several: you do not plan separately for battery purchases, the labour of replacements or operational checks. Only the number of transmitters changes, not the structure of the bill.

The item does not cover the initial installation or the extension of the network with new points. These elements are priced separately, usually per unit including installation.

What does it come to over 4 years: 50, 100 and 200 transmitters?

At a rate of PLN 7 net per unit per month, the annual cost is PLN 84 per transmitter, and the 4-year cost is PLN 336. For 50 transmitters this gives PLN 16,800 net over 4 years, for 100 units PLN 33,600, and for 200 units PLN 67,200.

The values grow linearly, so they are easy to scale. If the hall is 3,000 m2 and you use a density of 1 transmitter per 100 to 200 m2, you need from 15 to 30 points, which gives PLN 5,040 to 10,080 net over 4 years.

  • 50 transmitters: PLN 4,200 per year, PLN 16,800 over 4 years.
  • 100 transmitters: PLN 8,400 per year, PLN 33,600 over 4 years.
  • 200 transmitters: PLN 16,800 per year, PLN 67,200 over 4 years.

Cumulative maintenance cost of 100 transmitters

Cumulative maintenance cost of 100 transmittersLine chart: PLN 8,400, 16,800, 25,200 and 33,600 net cumulative cost in years 1 to 4010,00020,00030,00040,000PLN netYear 1Year 2Year 3Year 4Year 1: 8400 PLN net8400Year 2: 16,800 PLN net16,800Year 3: 25,200 PLN net25,200Year 4: 33,600 PLN net33,600
Source: Example calculation: 100 x PLN 7 x 12 months per year; indicative ranges from deployments in 2025 and 2026; price quoted individually

Why don't we calculate battery life down to the month?

Battery life is not given as a guarantee, because it depends on transmission power, calibration to the hall and temperature. For this reason a model based on a fixed monthly rate is more honest than a promise of a specific number of years: the plant pays for the result, which is a working network.

Power calibration after installation extends battery life, because it reduces interference. Battery life is therefore planned after calibration, not according to factory settings, which limits the risk of unexpected replacements.

How do you calculate the maintenance cost for your own hall?

Three numbers are enough: the number of transmitters, the monthly rate and the horizon in months. The formula is the number of transmitters times the rate times the number of months. For 120 transmitters and 48 months: 120 x 7 x 48 = PLN 40,320 net.

The number of transmitters is set by the plant layout: in buildings 1 transmitter per 100 to 200 m2, and along plant roads roughly every 100 m. The page on selecting the number of transmitters shows how to convert the area into points.

Maintenance cost over 4 years by network size

Maintenance cost over 4 years by network sizeBar chart: PLN 16,800, 33,600 and 67,200 net over 4 years for 50, 100 and 200 transmitters020,00040,00060,00080,000PLN net50 units: 16,800 PLN net16,80050 units100 units: 33,600 PLN net33,600100 units200 units: 67,200 PLN net67,200200 units
Source: Example calculation: number of units x PLN 7 x 48 months; price quoted individually

What changes for a large network that has been running for years?

Large networks are maintained under the same model: a location system with 200 BLE beacons is already running at a client site, and the maintenance offer covers battery replacement every few years. Changing mobile devices does not require rebuilding the transmitter network.

This matters when planning over 4 years: phones and readers are replaced on a different cycle from transmitters, so the investment in the network is not made obsolete by a change of user equipment.

What should you watch for when comparing offers?

Compare the full cost: purchase or installation, maintenance, battery replacement and the scope of support. An offer with a lower initial price can turn out more expensive after 4 years if batteries and replacement labour have to be bought separately.

Also ask whether the price includes monitoring of operation, because without it a failed point is detected only when someone reports an incorrect position.

Example calculation

Transmitter network maintenance cost over 4 years

Assumptions
ParameterValue
Maintenance rate7 PLN net per unit per month
Horizon48 months
Number of transmitters200 units

Result: 200 x 7 x 48 = PLN 67,200 net over 4 years, which is PLN 336 net per transmitter

Note: Example calculation. Indicative ranges from deployments in 2025 and 2026; price quoted individually. Does not include the initial installation or the extension of the network.

Video

Frequently asked questions

Is PLN 7 per month a fixed price for every plant?

No. It is an indicative rate from deployments in 2025 and 2026, and the price is quoted individually. It depends, among other things, on the size of the network, its layout and the scope of support.

Is battery replacement charged separately?

In the maintenance offer, battery replacement is part of the service. Beyond the monthly rate, the initial installation and the extension with new points are billed separately.

Can the battery life be given in years?

We do not give battery life as a guarantee. It is planned after calibrating the power to the hall, and the replacement is carried out by the service.

Does changing phones require rebuilding the network?

No. Changing mobile devices does not require rebuilding the transmitter network.