InnerWeb
Skip to main content

200 radio beacon network: battery swap with no downtime

A network of 200 BLE radio beacons is already running at the client site and needs neither cabling nor mains power. For the head of maintenance the key question is how to replace batteries without switching the installation off and without stopping production.

200
BLE radio beacons in a running system
Source: project card
16,800 PLN
indicative annual maintenance cost for 200 units (net)
Source: sample calculation
2 days
installation of 100 transmitters across 8 floors
Source: project card

The situation: 200 transmitters in a plant that cannot stop

The case described here comes from a real deployment: a location system with 200 BLE radio beacons runs at the client site, in a plant where stopping the installation is a last resort. The head of maintenance therefore asks not only about installation, but about what happens after several years, when the batteries start to run down.

The transmitter network is treated like any other supporting infrastructure: it has an owner, an inspection schedule and a budget. The difference is that radio beacons need no cables and no mains power, so servicing them does not touch the plant's electrical installation and does not require circuit shutdowns.

Why battery power simplifies maintenance

The transmitters are battery powered. Installation takes place without intervening in the electrical installation, which in continuous-operation plants is often a condition for entering the site. The same property holds over the years: a battery replacement is a mechanical task performed at the transmitter, with no shutdown notices and no qualified electrician needed for switching operations.

In another deployment, battery power allowed a network of 100 transmitters across 8 floors to be installed on site in 2 days, without shutting down the installation and without connecting to mains power. Since the first installation did not stop the facility, the same approach applies to servicing: work in windows that the plant selects, not the supplier.

The beacon network is also resilient to changes in mobile devices. Replacing employees' phones or readers does not require rebuilding the transmitter network, so the mobile equipment schedule and the battery schedule can be planned independently.

Cumulative maintenance cost for 200 radio beacons

Cumulative maintenance cost for 200 radio beaconsLine chart: maintenance cost for 200 radio beacons grows linearly from 16,800 PLN in year 1 to 67,200 PLN in year 4.020,00040,00060,00080,000PLN netYear 1Year 2Year 3Year 4Year 1: 16,800 PLN net16,800Year 2: 33,600 PLN net33,600Year 3: 50,400 PLN net50,400Year 4: 67,200 PLN net67,200
Source: Sample calculation based on the assumptions in the page text; not an offer, individual quotation applies.

What the maintenance service looks like in practice

Transmitter network maintenance covers battery replacement as part of the service, monitoring of correct operation and ongoing support. The maintenance offer assumes battery replacement every few years, not every few months, so the workload is spread over time and is predictable.

We do not give battery life as a guarantee. Actual service life depends on the transmission power set after calibration in the hall and on environmental conditions, which is why the replacement plan is based on monitoring rather than on a single figure from a catalogue. The plant's traffic manager receives a list of transmitters that need attention in advance, before a signal disappears from the map.

Good practice is to divide the network into service zones that match the maintenance team's rounds. Replacement proceeds zone by zone, and after each zone the map is checked to confirm that positioning in that area has returned to normal.

Sample calculation: maintenance cost for 200 units

The indicative maintenance cost is about 7 PLN net per unit per month (indicative ranges from deployments in 2025-2026; individual quotation). For 200 transmitters this gives 1,400 PLN net per month, 16,800 PLN net per year and 67,200 PLN net over a 4-year horizon. This amount covers battery replacement, monitoring and support, so the plant does not plan separately for buying batteries or for service hours.

For comparison, it is worth calculating the in-house alternative: employee time for a round of 200 points, battery purchases, replacement records and fault documentation. Each plant performs this calculation at its own rates, which is why we do not present savings here as a fact, only as a method of comparison.

Note that this is the cost of maintenance, not the cost of deployment. Installation is quoted separately, per unit including installation, after the spacing has been agreed on the plant layout.

Conclusions for the head of maintenance

First, a battery-powered transmitter network is not a point that forces a shutdown, either on the day of installation or on the day the cells are replaced. Second, the service plan is based on monitoring, not on a promise of battery life. Third, the cost can be calculated in advance and grows linearly with the number of units.

Before signing the terms, it is worth agreeing on three things: the service zones, the service windows selected by the plant, and the way the network status is reported to the maintenance department.

Example calculation

Maintenance cost for 200 radio beacons

Assumptions
ParameterValue
Number of radio beacons200 units
Indicative rate7 PLN net/unit/month
Horizon4 years

Result: 1,400 PLN net per month, 16,800 PLN per year, 67,200 PLN over 4 years

Note: Sample calculation; indicative ranges from deployments in 2025-2026; individual quotation applies.

Video

Frequently asked questions

Does replacing a battery require shutting down the installation at the plant?

No. The radio beacons are battery powered and are not connected to the electrical installation, so replacing cells requires no circuit shutdowns and no stop in production.

How long do the batteries in the radio beacons last?

The maintenance offer assumes replacement every few years, but we do not give battery life as a guarantee. It depends on the power set after calibration and on conditions in the hall, which is why the plan is based on monitoring.

What does the monthly maintenance cost cover?

Battery replacement as part of the service, monitoring of correct operation and ongoing support. The indicative cost is about 7 PLN net per unit per month; individual quotation applies.

Does replacing employees' phones require rebuilding the transmitter network?

No. Changing mobile devices does not require rebuilding the transmitter network, because the infrastructure and the end devices are independent of each other.

Let us plan the transmitter network maintenance

We will describe a battery replacement plan for your facility and calculate maintenance based on the number of units. The quotation is individual.

Let's talk