What the service tab shows
The delivery locator service tab shows the physical pool of devices: battery level, charging, gate or location and the number of the active delivery. The data refreshes every 5 seconds, so the coordinator sees the current situation, not the state from several minutes ago.
This is read-only diagnostics. The tab does not change device settings; it only suggests what to do: a locator that is offline or has a battery of up to 5% gets a recommendation to recharge, and a locator with a low battery outside a multi-charger gets a recommendation to be put back on a multi-charger.
How to read the recommendations
Two kinds of recommendation cover most cases. Recharging applies to devices that are switched off or have a battery of up to 5%: we will not send them out with a driver, because they may run out on the route. Returning to a multi-charger applies to devices with a low battery that are lying elsewhere, for example in the security cabin.
Charging is inferred from the battery trend at the multi-charger location, because devices rarely report their actual charging state. If the battery rises, the system considers the device charged. If a device stands in a multi-charger and the battery falls, the contact or the power supply of the multi-charger should be checked.
Devices with an active delivery
A locator with the number of an active delivery is with a driver on the plant grounds. If its battery is low, do not take it from the driver; instead inform the dispatcher so that the swap is planned for the nearest opportunity, for example at the next gate.
Thresholds in the locator service tab
Rhythm of checks during a shift
At the start of the shift, check how many devices are charged and where they are. Before the peak of deliveries, identified from the notices, review the pool once more and top up the charging. At the end of the shift, pass the list of offline or suspicious-battery devices to the next shift.
The size of the pool should include a reserve for devices that are charging or in service. If during the peak the coordinator often sees a shortage of free locators, that is a signal to enlarge the pool or add a multi-charger at the gate, not to shorten the charging.
Recurring problems: how to tell them apart
A single device that regularly drops out of the pool usually has a hardware problem: battery, cable or contact. Several devices going offline at the same place at the same time suggests a problem with the beacons or the power supply in the area, not with the locators.
Location relies on signals from several BLE beacons averaged on the map, without GPS, and plant roads are fitted with beacons about every 100 m. If several locators disappear on the same stretch of road, check the beacons on that stretch. A report with the device number and the time speeds up service.
What this check gives the plant
A charged pool means voice navigation works for every driver, and the route is saved for any analysis after an incident. For the coordinator, it is a few minutes of checks per shift instead of putting out fires at the peak.
InnerWeb is a software maker, and the locators and multi-chargers are purchased and integrated by us. The service tab is part of the software and makes it easier to supervise the pool regardless of the hardware supplier.
Checklist
Video
Frequently asked questions
Does the service tab change locator settings?
No. It is read-only diagnostics that suggests recommendations but does not change anything on the devices.
How does the system know a locator is charging?
It infers this from the battery trend at the multi-charger location, because devices rarely report their actual charging state.
What does several offline devices in one place mean?
Most likely a problem with the beacons or the power supply in that area, not with the locators themselves. Check the beacons on that stretch.
Let's put the pool service in order
We will show the service tab on a sample pool and help set the check rhythm for your shifts.
Let's talk