Five cost components of the implementation
The cost of implementing a driver locator pool consists of five items. The first is the locators themselves, which the driver receives at the gate and returns on exit. The second is the multi-chargers, where the devices return to readiness. The third is the BLE beacons fitted along the plant roads.
The fourth item is integration with the client's notice system, carried out over SOAP and requiring implementation work. The fifth is upkeep: replacing worn devices, servicing, supervising the pool and updating the navigation matrix. InnerWeb is a software maker, and the hardware, such as locators and multi-chargers, is purchased and integrated by us.
- Driver locators.
- Multi-chargers and their placement.
- BLE beacons on plant roads.
- Integration with the notice system over SOAP.
- Pool upkeep: servicing, replacement, supervision.
What the number of locators depends on
The number of locators is set by the peak: how many vehicles are on the plant grounds at the same time, not how many enter in a day. A reserve for devices that are charging or in service is added on top. A plant with several gates must also account for the fact that a locator returned at one gate goes back to the pool, and the next driver may enter through another gate.
The service tab for delivery locators helps here: it shows the physical pool with battery level, charging, gate or location and the number of the active delivery, refreshed every 5 seconds. Based on it you can see whether the pool is too small during peak hours.
Charging and multi-chargers
Charging of a locator is inferred from the battery trend at the multi-charger location, because devices rarely report their actual charging state. It is worth placing multi-chargers at the gates, where the locators return, rather than in a distant office, because that distance lengthens the device cycle.
Sample split of the pool implementation cost
Sample calculation of pool size
Let us assume a plant with three gates, where at peak time 30 vehicles are on the grounds at the same time. The reserve for charging and servicing is 20% of the pool. The required pool is 30 plus 6, that is 36 locators. If one multi-charger holds 12 devices, three are needed, one at each gate.
This is a sample calculation on assumptions, not the result of an implementation: you will set your own numbers from notice data and the working patterns of the gates. For the cost structure we assumed a sample percentage split below, which shows that the device pool itself accounts for at most a few dozen percent of the budget, and the rest is infrastructure and integration.
Cost structure: a sample split
In the sample split, locators make up 40% of the implementation cost, BLE beacons 20%, integration 20%, multi-chargers 10% and first-year upkeep 10%. The share of beacons grows with the length of plant roads, because roads are fitted about every 100 m, and indoors one beacon is assumed per 100-200 m2.
The share of integration grows when the notice system has an unusual service contract or the test environment is hard to access. These are indicative shares for planning, not prices. Indicative ranges from 2025-2026 implementations are shared in the conversation, and pricing is individual.
What lowers and what raises the cost
The cost is lowered by: shorter driver routes, one main gate, existing power infrastructure for beacons and a ready service description of the notice system. The cost is raised by: a large site, many gates, an extensive navigation matrix for many warehouses and strict requirements for handling devices in explosion-risk zones.
When comparing offers, ask what is included in the price: whether it covers multi-chargers, road beacons, integration and upkeep, or only the locators. Differences in scope often explain differences in price more than the price of the device itself.
Locator pool size, sample calculation
| Parameter | Value |
|---|---|
| Gates | 3 pcs |
| Vehicles on the grounds at peak | 30 pcs |
| Reserve for charging and servicing | 20 % |
| Multi-charger capacity | 12 devices |
Result: A pool of 36 locators and 3 multi-chargers, one at each gate.
Note: Sample calculation, not the result of an implementation. Indicative ranges from 2025-2026 implementations are shared in the conversation; pricing is individual.
Video
Frequently asked questions
Does InnerWeb manufacture driver locators?
No. InnerWeb is a software maker. Hardware, such as locators and multi-chargers, is purchased and integrated by us.
How do we know the pool is too small?
The service tab shows the physical pool with battery, location and the number of the active delivery, refreshed every 5 seconds. It shows how many devices are free at peak times.
How many beacons are needed?
On plant roads they are placed about every 100 m, and indoors one beacon per 100-200 m2 is assumed. The exact number is set by an analysis of the plant layout.
Let's estimate the pool for your plant
Send us the number of gates and vehicles at peak, and we will prepare indicative ranges and a description of the implementation scope.