Why a checklist at the gate
A driver's entry is a short moment in which everything has to match: the delivery must be notified, the vehicle and driver identified, and the driver informed how to reach unloading. A mistake made at the gate carries over to junctions and ramps, where it costs more time.
The checklist shortens the training of new security staff and standardises the work of the shifts. It does not replace the plant's procedure; it complements it with checks that follow from how the delivery and notice system works.
Checks before the barrier opens
The order matters, because the result of one step conditions the next. First the notice data, then the target location, then the device and language, and finally the briefing. The list below is collected in the checklist section, and here we discuss the most common pitfalls.
Notice code and delivery data
After the card code is entered, the system retrieves the planned delivery data from the notice system and pre-fills the form. The query goes out as a canonical five-character code, so leading zeros do not change the result. If the system returns no data for a delivery with a completed transport, this is the intended behaviour, not a fault: the driver must go back to the carrier or the dispatcher for a correct notice.
Operation type and target dock
The operation type from the notice, unloading or loading, sets the delivery label, and the handling point name is matched against warehouse and dock codes. The target dock in the delivery is essential for navigation: it defines the warehouse to which the voice message will lead.
Locator, language and supervision
Security assigns the locator, chooses the message language and, when needed, marks the delivery under special supervision. On the online map a vehicle with navigation for a foreign driver is red, and under special supervision it is black.
Number of control points by group
One-minute briefing
The entry briefing should take about a minute and cover four things: which warehouse the driver is heading to, that the voice will guide them at junctions, that road signs and speed limits still apply, and that the locator must be returned on exit.
Remember that voice navigation is not GPS. If the driver leaves the route, the system may fall silent, because a wrong direction is worse than no message. In that situation the driver should stop and contact security or the dispatcher.
When not to open the barrier
The barrier stays closed when: the notice code returns no data and there is no other confirmation of the delivery, the driver has no available locator with a charged battery, or the delivery has no target dock. The decision to enter in such cases is taken under the plant's procedure by the dispatcher or the person responsible for deliveries, not by security on their own.
Error messages on the security terminal are translated into 6 interface language versions, and the lack of an active transport for a card is communicated in the operator's language. It is worth practising them in training so that security recognises them without hesitation.
Proof and trail after entry
Every search by card code is recorded in telemetry with the code, result, status, response time and source. As a result, if there is a dispute over whether a card worked, the plant has numbers rather than opinions. At the same time, the delivery route on the online map later lets you check how the driver reached the warehouse.
Checklist
Video
Frequently asked questions
What should be done when the card code returns no data?
Ask the driver to contact the carrier or the dispatcher about a correct notice. For a delivery with a completed transport, no data is intended, so that the driver is not wrongly identified.
How long should the briefing take?
About a minute. It should name the warehouse, explain the voice at junctions, remind the driver about signs and the return of the locator.
Who decides on entry when not all checks are complete?
Under the plant's procedure the dispatcher or the person responsible for deliveries, not security acting on their own.
Let's roll out the checklist at your gate
We will adapt the checklist to your procedure and train the security shifts on the terminal.
Let's talk