Why the pool needs management
A delivery locator is issued to the driver by security at the gate, and returned after the delivery is over. Between issue and return the device runs on battery, transmits signals and guides the driver with voice prompts. If several locators come back with low battery and are not put on charge, there are not enough working units at the next shift.
This problem is not technical, but organizational. That is why the recommendations concern the charging place, the threshold for putting devices back and a shared view of the pool for security and the dispatcher.
Recommendation 1: size the pool from the peak of simultaneous deliveries
The number of locators in circulation is set by the peak of simultaneous deliveries on the plant premises, plus a reserve for charging and failures. There is no single number for all plants, because it depends on the number of gates, the length of the driver's stay and the rhythm of shifts.
Good practice is to take the highest number of vehicles on the premises at the same time over a few typical weeks, and add a reserve for devices being charged and withdrawn for service. We give a detailed example in the sample calculation below, with the assumptions stated openly.
Sample locator pool for a plant (example calculation)
Recommendations 2 and 3: multi-chargers close to the gate and the rule of putting devices back
Recommendation 2: place the multi-charger where the locator returns from the driver, that is at the gate or in the security room. A device that comes back at the end of a shift to a drawer in another building will not be charged in time.
Recommendation 3: introduce the rule of putting the locator back immediately. Charging of a locator is inferred from the battery trend at the multi-charger location, because devices rarely report their actual charging state. This means the device must physically stand in the multi-charger for the system to confirm that it is charging. Returning it to a drawer leaves a gap in the picture of the pool.
Recommendations 4 and 5: read the service tab and react to thresholds
The service tab of delivery locators shows the physical pool of devices with battery, charging, gate or location, and the number of the active delivery, refreshed every 5 seconds. It is a view for security and service, not for the driver.
The tab is read-only diagnostics. A locator that is offline or has a battery at 5% or below receives a recommendation to recharge, and a locator with a low battery standing outside the multi-charger receives a recommendation to put it back in. Recommendation 5: decide who on each shift reacts to such recommendations and within what time, because the tab alone fixes nothing.
- Refresh the view at the start of the shift and before the peak of deliveries
- Withdraw locators that are offline or have a battery at 5% or below
- Put back in the multi-charger the devices with a low battery standing outside it
- Record in the shift log which units need service
Recommendations 6 and 7: the role of the equipment supplier and the limits of the function
Recommendation 6: decide who buys and services the physical devices. InnerWeb is a software producer, and we buy and integrate the locators and multi-chargers. It is worth stating clearly in the contract who replaces worn batteries and within what time.
Recommendation 7: do not expect more from the tab than it does. It is a read-out, not control of charging. It will not send a charging command remotely, nor block issuing a weak device. The decision stays with security, which is a deliberate choice for simplicity and predictability.
Pool size for a plant with a peak of 20 deliveries
| Parameter | Value |
|---|---|
| Peak of simultaneous deliveries | 20 vehicles |
| Units in the multi-charger at a given moment | 6 pcs |
| Reserve for failures and service | 2 pcs |
Result: 20 + 6 + 2 = 28 locators in circulation
Note: Example calculation on stated assumptions, not client data. The actual pool depends on the number of gates, the length of stay and the rhythm of shifts.
Video
Frequently asked questions
Does the service tab control charging?
No. It is read-only diagnostics that shows the state of the pool and suggests recommendations for security or service.
How does the system know that a locator is charging?
Charging is inferred from the battery trend at the multi-charger location, because devices rarely report their actual charging state.
Does InnerWeb supply the locators and multi-chargers?
InnerWeb is a software producer. Hardware such as locators and multi-chargers is purchased and integrated with the system by us.
Let's calculate the locator pool for your gate
Book a call. Based on the number of gates and the rhythm of deliveries, we will help estimate the pool and the placement of multi-chargers.
Let's talk