BLE transmitters on plant roads: implementation notes

Voice navigation is only as good as the transmitter grid it runs on. A junction is announced about one transmitter before it, so the placement of transmitters along the access roads decides whether the driver hears the prompt in time.

100 m
approximate spacing of transmitters on plant roads
Source: company facts
2
consecutive signals from the same transmitter that confirm an announcement
Source: navigation functions sheet

Why placement decides the quality of navigation

The driver's location relies on signals from several BLE transmitters averaged on the map, without GPS. This lets the system work where GPS fails, for example between tall warehouses or under loading canopies. The price of this independence is the need to line the roads with transmitters.

Plant roads are equipped with transmitters about every 100 m. This is a starting value, which has to be adjusted to the geometry of the plant: long straights, bends and dense junctions.

The rule: one transmitter before a junction

A directional prompt is announced about one transmitter before the junction, after the same transmitter has been confirmed in two consecutive signals. This rejects a single distant reading, but it means that a transmitter must stand before every junction on the route, which the driver passes in time.

With a spacing of about 100 m, the announcement comes roughly 100 m before the junction. At a normal truck speed on plant premises this gives the driver time to slow down and turn. If the spacing were several hundred metres, the prompt would come too early or not at all.

Number of transmitters along an access route (example calculation)

Number of transmitters along an access route (example calculation)Bar chart: 5 transmitters on a 500 m route, 10 on 1000 m, 20 on 2000 m05101520pcsRoute 500 m: 5 pcs5 pcsRoute 500 mRoute 1000 m: 10 pcs10 pcsRoute 1000 mRoute 2000 m: 20 pcs20 pcsRoute 2000 m
Source: Example calculation: spacing of about 100 m, number of transmitters = route length / 100 m

Next steps of the placement

We recommend working in five steps, from the map to a trial on the ground.

  • Step 1: plot the access roads and junctions on the plant map
  • Step 2: mark the routes to each warehouse covered by navigation
  • Step 3: place a transmitter before each junction on the route, and complete the grid about every 100 m
  • Step 4: run a control drive with a locator and check whether signals from several transmitters are stable
  • Step 5: correct the placement and record it in the installation documentation

Pitfalls on the ground

The first pitfall is a transmitter placed too close to a junction. The prompt is then announced when the driver is already approaching it, and there is no time left for the manoeuvre. The second is a transmitter set behind cover, for example behind a container or a steel structure, which dampens the signal and lowers the quality of the readings.

The third pitfall concerns approach arms. The relative direction is calculated at the moment of passing, from the actual approach segment driven by the driver. When the approach arm is unknown, the system stays silent, because a wrong direction is worse than no prompt. A grid that is not dense enough on the approaches to a junction therefore produces silence, not wrong guidance.

The fourth pitfall is infrastructure changes. A new gate, a construction detour or a closed warehouse change the routes. After every such change, check the transmitter grid and the matrix of prompts.

Limits of responsibility and equipment

InnerWeb is a software producer, and the InnerWeb industrial beacon has an industrial design, a CE declaration and an ATEX construction for zones 2 and 22. On plant roads inside explosion-risk zones, check the zone classification before mounting any device.

InnerWeb is an independent system that complements the customer's existing systems. We do not replace access control systems and we do not manufacture readers. The transmitters form a separate grid that supports location and navigation.

Video

Frequently asked questions

Does navigation work without GPS?

Yes. Location relies on signals from several BLE transmitters averaged on the map, without GPS.

How densely should transmitters be placed on the roads?

Roughly every 100 m, adjusted to the geometry of the plant, with a transmitter before every junction.

What happens when the approach arm is unknown?

The system stays silent, because a wrong direction is worse than no prompt. A denser grid on the approaches reduces such cases.