Boiler house on 45 levels in the 3D editor: a concept for a power plant dispatcher

A boiler house with 45 levels is a building where searching for a person through the level selector is no longer obvious. We describe a concept for an energy facility: how 45 levels fit into the 3D editor, how the dispatcher reaches the right level and what the local system in the client's OT network changes for trust in the data. This is a concept, not a description of a deployment.

45
boiler house levels in the concept
Source: card
12
buttons in the selector window above 12 levels
Source: card
32
levels in the test building
Source: card

Situation: a tall boiler house and the dispatcher's question

The offer for an energy facility described the position of a person on the plan of each floor and 45 levels of the boiler house in the 3D editor, with a local system in the client's OT network. That offer was a concept presented to the client, so we do not describe operating results, only the way of working such a configuration makes possible.

A dispatcher in a power plant does not ask whether a person is in the boiler house, because they know that from the rota. They ask on which of the 45 levels, and they ask at the moment someone pressed the SOS button or stopped moving. The time it takes to search the selector counts toward the reaction time.

How 45 levels fit into the selector

The level selector appears only when the selected building has at least two levels. The labels in the Polish version are P, 1, 2 and so on. With a small number of levels that is enough, but with 45 levels the list does not fit on the screen.

Above 12 levels the selector shows a window of 12 buttons with up and down arrows, and the mouse wheel scrolls the list by one level. For 45 levels this means that about one quarter of all levels is visible on screen at once, and the rest is revealed by scrolling.

Why this limit exists

A test building with 32 levels (P and 1-31) did not fit in a 1600 by 900 pixel window, and that is what forced the level scrolling. With 45 levels the problem is even bigger, so a full list on screen would be hard to read.

Example calculation of selector windows

With a window of 12 buttons, 45 levels take up 3.75 windows, so going through them from bottom to top requires four views. In practice the dispatcher rarely scrolls through everything, because they go straight to the person's floor from the person's card on the map.

Levels against the selector window (number of levels)

Levels against the selector window (number of levels)Horizontal bar chart: selector window 12, test building 32 levels, boiler house 45 levels.01020304050levelsSelector windowSelector window: 12 levels12Test buildingTest building: 32 levels32Boiler house in the conceptBoiler house in the concept: 45 levels45
Source: Cards: 12-button window, test building with 32 levels, concept with 45 levels

Finding a person without scrolling

The fastest path for the dispatcher skips the selector. A double-click on the person on the online map opens the building on the floor where that person is. With 45 levels this saves scrolling and the risk of picking the wrong level by one.

The selector is still needed when the dispatcher wants to view a specific level without a person, for example before sending a team. Then the mouse wheel moves the list by one floor at a time, and the arrows move it by a window.

The local system in the client's OT network

In the power plant concept the system runs locally inside the client's OT network. Positions of people and the map do not leave that network, which simplifies the discussion with the IT security department and reduces the number of connections that have to be agreed.

A person's location is calculated from the signals of several transmitters and averaged on the map, and the system works without GPS. This matters in a boiler house, where the satellite signal does not reach levels inside the structure.

What to prepare before go-live

For a tall building the preparation starts with a model of the floors. It is worth establishing which levels are full floors and which are platforms or galleries, because this affects the number of transmitters and what the dispatcher sees in the selector.

  • A list of levels with names that the dispatchers and the operating staff know.
  • The numbering rule: P for the ground level, consecutive numbers for the others.
  • Dispatcher training on scrolling the selector and on entering through the person's card.
  • A trial with a person walking from the lowest to the highest level, checking the position on each.

Conclusions for the dispatcher and the plant manager

With 45 levels, what matters is not the 3D map itself but the path from the event to the right floor. If the dispatcher enters the floor from the person's card, the selector is a supporting tool, not the main one.

It is worth checking the concept in a pilot in one part of the boiler house before building the full model. This makes it possible to assess the readability of the selector and the accuracy of positions without building the whole facility.

Video

Frequently asked questions

Are 45 levels a real deployment?

No, it is a concept from the offer for an energy facility. We describe how the system handles a building of this kind, not operating results.

How many floors are visible at once in the selector?

For a building above 12 levels the selector shows a window of 12 buttons. The other levels are revealed with the arrows or the mouse wheel.

Does the dispatcher have to scroll the selector to find a person?

No. A double-click on the employee opens the building on the floor where that person is.

A tall energy facility?