Starting point: a site where the driver disappears from view
A chemical plant with a large site has several gates, an entry weighbridge and several warehouses a few hundred metres apart. The driver enters at the gate, drives to the weighbridge and then to the assigned warehouse. The logistics dispatcher sees the beginning and the end of this route in the records, but cannot see what happens in between.
In one delivery monitoring project on such a site, the standard route was described as gate, weighbridge, warehouse. The system measures the time of each stage separately and detects deviations from the agreed norm. This approach changes the dispatcher's question: instead of asking where the driver is, the dispatcher asks which stage has exceeded its norm and by how much.
Problem: the delay becomes visible only at the end
Without stage measurement, a delay shows up when a tanker or truck fails to reach the warehouse on time, or when the warehouse clerk calls about the delivery. Only then does the dispatcher start looking for the cause: a queue at the weighbridge, a wrong route, a stop outside the designated place or a vehicle breakdown.
On sites with stricter safety requirements, there is an additional difficulty: the driver should not stay off the designated route. A longer stop in an unexpected place is information that is needed at once, not after the delivery is closed.
- gate stage: waiting for verification and admission,
- weighbridge stage: queue and weighing before unloading,
- warehouse stage: approach, unloading and departure,
- sections between stages: the most common place for unnoticed stops.
Sample time norms per delivery stage (illustrative calculation)
Solution: stage time as a measured and alarmed value
The delivery stage timer works on a simple rule. A standard time is set for each stage. When a stage lasts longer, the system triggers a phone alert and notifies the person responsible. The dispatcher receives the information at the moment of the overrun, not after the delivery is closed.
The full course of each delivery, meaning the route and the times per warehouse, goes into reports. This way the same data set serves two purposes: immediate reaction to a deviation and later analysis of which warehouse or which stage generates the most delays.
Route view of a single delivery
The dispatcher can isolate one active delivery and see the route of the driver's locator from the entry. The route marks stops longer than one minute and the pin of the declared destination. This makes it possible to tell a driver who waits in the weighbridge queue from one who stopped in a place unrelated to the delivery.
Status of driver devices
The service tab of driver locators is read-only. Devices that are offline or have a battery at or below 5 percent receive the recommendation to charge them and switch them on. Before a shift, the dispatcher sees which locators need attention, so a gap in measurement does not come from a discharged device.
Effect: what changes in the dispatcher's work
The change is a move from reacting after the fact to reacting during the stage. The dispatcher does not wait for a call from the warehouse, because the timer alert appears the moment a stage exceeds its norm. The message contains the stage the driver is in and the time by which the norm was exceeded.
In this case the implementation card does not give a numerical effect in minutes or percent, so none is quoted here. We keep to what is confirmed: three stages are measured, the alarm is raised after the standard time is exceeded, and the reports contain routes and times per warehouse. The numerical value is set by the plant after the first weeks of measurement, on its own data.
Conclusions for plants with a similar profile
The first conclusion: before alarms are set, the time norm of each stage should be established on data from several weeks, not on assumptions from the project. A norm that is too tight generates false alarms, and one that is too loose stops being useful.
The second conclusion: the stage timer does not replace the dispatcher's decision. It provides information that something takes too long, and the assessment of the cause stays with a person. The third conclusion: after a few months, alarm data show bottlenecks, for example a queue at the weighbridge at a particular time of day, and allow the plant to change how deliveries are organised, not only to react to their effects.
Video
Frequently asked questions
Does the stage timer require changes to gate procedures?
No. It does not change the entry procedure. It adds measurement of stage times and a notification when a norm is exceeded. The plant keeps running the gate procedure as before.
How does the system know the driver is at a given stage?
From the driver's locator, whose route is recorded from the entry. The position comes from signals of several transmitters averaged on the map, without GPS.
What if the driver's locator is discharged?
The service tab shows devices that are offline or have a battery at or below 5 percent and suggests charging. The tab is read-only.
Do the data also go into reports?
Yes. The full course of each delivery, the routes and the times per warehouse, goes into reports that show recurring delays.
See delivery stages on the map of your plant
We will show how to measure the time of the weighbridge, the gate and the warehouse and set up the alarm. Book a call or a demonstration.
Let's talk