Why idle time must be calculated on the plant's own data
The tanker's idle time and the cost of an idle hour are the plant's variables. They depend on the number of gates, queues, the type of product, contracts with carriers and penalty clauses. That is why we do not give a single amount, only a calculation scheme that the logistics manager fills in with data from their own reports.
A note on input data: without measuring the time of each stage it is hard to say where the minutes disappear. In one delivery monitoring deployment on the wide site of a chemical plant, the standard route is gate, weighbridge, warehouse, and the system measures the time of each stage and detects deviations. This measurement is the basis of any cost calculation.
Formula: how to calculate the monthly cost of excess time
The monthly cost is the number of tankers per day, times the excess idle minutes per tanker, divided by 60 and multiplied by the cost of an hour, and then by the number of working days in the month. Example: 20 tankers a day, 12 excess minutes each, an hour costs 400 PLN and there are 22 working days.
A day gives 20 times 12, which is 240 minutes, or 4 hours of excess idling. At an hour cost of 400 PLN that is 1,600 PLN a day, and 35,200 PLN in the month. All four numbers are example assumptions, not data from any plant.
- 20 tankers a day (example assumption)
- 12 excess idle minutes per tanker
- idle hour cost 400 PLN (example assumption)
- 22 working days in the month
Monthly cost of excess idle time in the example
What the time alarm does and how it affects the bill
A time alarm for a delivery stage rings the phone and raises an alert when the stage exceeds its standard time. The dispatcher learns of the delay while it is happening, not from the next day's report, so can act: unlock the weighbridge, reroute the tanker, call the driver.
The full delivery run, that is routes and times per warehouse, goes into the reports. They show at which stage the excess repeats. If the alarm and the dispatcher's action cut the excess idle time from 12 to 6 minutes, the example bill falls by half, to 17,600 PLN a month.
How to calculate the return, not only the saving
The saving is the difference in cost before and after. The return is the saving set against the cost of the system. To the system cost the logistics manager adds the transmitter subscription on the roads the tankers use, and the driver locators; for the roads, an indicative calculation of about 7 PLN net per transmitter per month can be used.
Example: 5 km of road is about 50 transmitters and about 350 PLN net per month. Against a saving of 17,600 PLN a month this cost component is negligible, but the real bill contains other items as well, so the final quote is set individually.
What this calculation does not say
The calculation does not prove that the alarm will shorten the idle time by 6 minutes. That is an assumption to verify in the pilot: for several weeks the stage times are measured without the alarm, and then with it. Only the difference from the plant's own measurements is a number worth showing the board.
It also does not include indirect costs such as contractual penalties, loss of unloading slots or the shifting of subsequent deliveries. If the plant knows them, it adds them to the cost of an hour.
Cost of excess tanker idle time: example on assumptions
| Parameter | Value |
|---|---|
| Tankers per day | 20 pcs |
| Excess idle time per tanker | 12 min |
| Cost of an idle hour | 400 PLN |
| Working days | 22 days per month |
Result: 240 minutes, or 4 hours of excess a day, 1,600 PLN a day and 35,200 PLN a month. After cutting the excess to 6 minutes: 17,600 PLN a month.
Note: Example calculation on example assumptions, not on plant data. The time and hour-cost figures are substituted by the plant; cutting idle time to 6 minutes is a hypothesis to test in the pilot.
Video
Frequently asked questions
Do you give the cost of an hour of tanker idle time?
No. It is a plant variable that depends on contracts and penalty clauses. We provide only the arithmetic scheme on example assumptions.
What does a delivery stage time alarm do?
It rings the phone and raises an alert when a stage, for example the gate, the weighbridge or the warehouse, exceeds its standard time.
Where do the data for the calculation come from?
From measuring the time of delivery stages: the full delivery run, with routes and times per warehouse, goes into the reports.
Is halving the excess time guaranteed?
No. It is an example assumption. The plant measures the real effect in the pilot.