What appears on screen after the appointment card scan?
If the plant has a delivery appointment system, it can be connected to InnerWeb via SOAP. After the appointment card code is scanned, the system fetches the delivery data and pre-fills the gate, dock and carrier form. The security officer does not retype it by hand, only checks and approves it.
The saving is not only time at the gate. Less manual entry means fewer mistakes in the carrier's name or the dock number, and those mistakes later throw reports out of line.
What if the appointment system does not return the carrier?
When the appointment data contains no carrier, the delivery form inserts a substitute value, so that entry can be registered. A missing field does not stop the tanker at the gate, but security can see that the data needs completing.
This matters on the night shift: the driver does not wait for someone on the other side to correct the record in the appointment system.
What security sees at successive stages of the tanker's stay
Why does the system sometimes show no data instead of the last delivery?
A transport with a completed status is deliberately treated as no data. The appointment system can return the last completed transport for many non-matching codes, and showing it would mean confusing the driver with someone else. It would also be a GDPR risk, because another person's data would appear on the security screen.
For the head of security the conclusion is practical: a no-data message is a deliberate safeguard, not a fault. The driver is then identified in another way, and the event stays in the record.
What does security see during the tanker's stay on site?
The delivery route view isolates one active delivery and shows the locator route from the entry, stops longer than one minute and the pin of the declared destination. Security therefore sees not only that the tanker is on site, but how it moves and whether it is heading where it declared.
A longer stop in a place unrelated to the destination is grounds for a conversation with the driver. A stop is not a violation in itself: a queue in front of the weighbridge looks on the map the same as an unnecessary halt, which is why the destination pin is the point of reference.
How does security know the driver's locator is working?
The service tab for driver locators is read-only. Devices that are offline or have a battery down to 5 percent receive the recommendation 'Recharge and switch on'. In this way, before entry it is known which locator is not transmitting, rather than discovering it only when the driver disappears from the map.
Every reading of an appointment card code is saved with its result, response time and operator. When someone reports that the cards are not working, the team has numbers to confirm or refute the report, instead of an argument based on impressions.
Will security see the location without GPS?
Yes. The locator position comes from transmitter signals placed on plant roads about every 100 m, not from satellites. If a road section runs under a pipe rack or between tanks, the system still shows the route, although the level of detail depends on transmitter coverage.
The spacing is set in the design for a specific road. Sections where security wants more detail, for example the area around the weighbridge and the loading stands, can be covered more densely.
Video
Frequently asked questions
Can the driver be confused with another transport?
The system guards against this: a transport with a completed status is treated as no data, so it does not show someone else's record.
How do we know the locator has a battery problem?
The service tab shows devices that are offline or have a battery down to 5 percent, together with a recharge recommendation.
Can security check what happened to the appointment cards?
Yes. Every reading is saved with its result, response time and operator.
Does the appointment system have to be replaced?
No. The existing appointment system can be connected to InnerWeb via SOAP.
See a delivery preview on your own data
Book a demo and see how security sees a tanker driver from the card scan to leaving the site.
Let's talk