Delivery pre-arrival and access code: implementation notes

During gate start-up, the guard scans a pre-arrival access code and sometimes sees the message "no transport" or a carrier that is not in the pre-arrival. This does not have to be a fault. Below are notes for the integrator and the guard on how to read each scan result and what to do with it.

3
scan results the guard is trained on: data, no transport, replacement carrier
Source: own compilation
5%
locator battery threshold for the charging recommendation
Source: feature card

How the integration with the pre-arrival system works

A plant with a delivery pre-arrival system can connect it to InnerWeb over SOAP. From the pre-arrival access code, the system retrieves the delivery data and pre-fills the gate, dock and carrier form. The guard sees the data at once and confirms it, instead of copying it.

The integration is an option. A plant without a pre-arrival system records deliveries by hand in the form. The notes below apply to plants that run the integration, and they describe behaviour that surprises the team in the first days of gate operation.

Result 1: a transport with the completed status

A transport with the completed status is deliberately treated as missing data. The reason is practical: the pre-arrival system can return the last completed transport for many non-matching codes. Showing such a result to the guard would confuse the driver and assign them someone else's data, which carries a GDPR risk.

The integrator should warn the guards that the message "no transport" can be the correct result, for example when a driver arrives with a card from a previous delivery. In that case the guard asks for a current pre-arrival or registers the entry by hand according to the plant's procedure.

Sample split of scan results in the first week (sample calculation)

Sample split of scan results in the first week (sample calculation)Pie chart example: 80 reads with delivery data, 12 with no transport, 8 with a replacement carrier.Delivery data: 80 reads (80%)No transport: 12 reads (12%)Replacement carrier: 8 reads (8%)100readsDelivery data80 reads (80%)No transport12 reads (12%)Replacement carrier8 reads (8%)
Source: Sample calculation: illustrative assumption of 100 reads; the plant will read the actual split from the record of reads

Result 2: no carrier in the pre-arrival data

When the pre-arrival data does not include a carrier, the delivery form substitutes a placeholder value so that the entry can be registered. This way, the absence of a single field does not block the gate during peak hours.

The placeholder has a cost: if nobody corrects it, the data will keep the replacement carrier instead of the real one. The procedure should state who completes the carrier after the entry and by when. It is good practice to filter the delivery report by the placeholder value, to see how many records need completing.

  • assign a person responsible for completing the carrier,
  • set a deadline for completion, for example by the end of the shift,
  • review the report of records with the placeholder value.

Record of reads as evidence

Every read of a pre-arrival access code is saved with its result, response time and operator. In the first weeks of gate operation, carriers often report that the cards do not work. The record allows the claim to be confirmed or refuted with numbers: how many reads succeeded, how many returned "no transport", how long the system took to respond.

It is worth agreeing observation indicators at the start: the share of reads with the result "no transport", the share with a placeholder carrier and the response time. A change in any of them shows whether the problem lies with the cards, the pre-arrival data or the network.

Order of gate start-up

First, test the read on several cards with different statuses: active, completed, without a carrier. Then train the guards on the three scan results and on what to do after each one. Next, start the gate, and during the first week review the record of reads once a day, not only after complaints.

Finally, decide whether the driver receives a locator, and link this to the entry procedure. The service tab of locators is read-only and shows devices that are offline or have a battery at or below 5 percent.

Video

Frequently asked questions

Why does the system show no transport when the card is valid?

A transport with the completed status is treated as missing data. The pre-arrival system can return the last completed transport for non-matching codes, which could confuse the driver.

What does a replacement carrier mean?

A value substituted when the pre-arrival does not contain a carrier, so that the entry can be registered. It must be completed after the entry.

How do I check whether the cards really do not work?

In the record of reads, which contains the result, the response time and the operator. Reports can be confirmed or refuted with figures.

Is the integration required to start the gate?

No. Without it, deliveries are registered by hand in the form.