Why a dryer is a difficult place to weld
A wood dryer chamber combines several risk factors: combustible wood and dust deposits on the structure, heated surfaces, ventilation that moves air, and tight passages. Welding or cutting in such a place requires the surroundings to be protected, and after the work there is time to detect smouldering, which does not produce an immediate flame.
During a shutdown the deadline adds pressure. Permits circulate on paper between the office, the supervisor and the contractor, and the information about who is working where and when is always slightly out of date.
One permit covering a chain of chambers
A permit covering several locations, for example a few adjacent chambers and the supply installation, is drawn on the map as one outline on the hall plan. The fire watch, the issuer and the contractor look at the same outline and the same list of protective measures. Permits issued to an external firm are handled on one permit, so there is no version held by the contractor and a different version held by the plant.
Hazards assigned to a location enter the permit from the catalogue: dust deposits on the structure, heat, ventilation. They can be edited in the permit and in the 3D plant map editor, separately for each building level, which matters for multi-level dryer buildings.
Stages after welding is finished
Role of the fire watch and the post-work period
For hot work, the system enforces an observation period after the work ends, in two stages, 1 h and 4 h, carried out by a fire watch on the contractor's side. Closing the hot work task is blocked until at least 3 hours of monitoring have elapsed. In a sawmill, where dust and shavings collect in hard-to-reach places, this time protects against smouldering after welding has finished.
The fire watch does not have to remember when the work ended: the system records it and shows how much time remains before the task can be closed.
Suspension and who is on site
If the situation changes, for example a neighbouring line is started or dust levels rise, a user on the plant side suspends the active permit. The suspension blocks closing tasks other than the unblocking tasks listed by the person who suspended it, so the contractor can finish only the safety actions.
The worker carries a BLE device that reports which transmitters it hears, the signal strength, the battery state and its status. After the location is recognised, the system adds the worker to the permits for the place of work or removes them from those permits. The issuer sees whether the welder and the fire watch are really at the chamber, without calling around the hall.
Welder qualifications
The system stores the qualifications, medical examinations and training results of the workers and, when a permit is created, checks whether the assigned workers hold the required and valid qualifications. A missing valid welding qualification is visible before work starts, not during an inspection.
Conclusions for a sawmill
The scenario shows that three things are key: a shared permit with an outline on the map, a post-work period enforced by the system, and visibility of the people at the place of work. Each of them works on the existing infrastructure, because InnerWeb is an independent system that complements the client's systems and works without GPS.
Before a shutdown it is worth assigning hazards to the dryer locations in advance and preparing a permit template for welding. During the shutdown, there is then no need to build everything from scratch.
- assign hazards to the dryer chamber and supply installation locations,
- prepare a welding permit template with the post-work period,
- decide who on the plant side can suspend a permit,
- check the validity of the crew's qualifications before the first day of the shutdown.
Video
Frequently asked questions
Is the fire watch on the plant side or the contractor's side?
The post-work observation is carried out by a fire watch on the contractor's side. The plant's issuer sees the same data on one permit and can suspend it.
Can one permit cover several chambers at once?
Yes. A permit covering several locations is drawn on the hall map as one outline.
Does the system work inside the hall without GPS?
Yes. The position comes from BLE transmitter signals heard by the worker's device, and InnerWeb works without GPS.